| 1. |
12-Dec-2025 06:55 PM |
29-Dec-2025 11:00 AM |
30-Dec-2025 11:00 AM |
[Providing and fixing tiles in kitchen and bathroom at Minor quarters and replacing old cement concrete flooring with vitrified tiles at B type quarters at Kailash Nagar Colony of Mungoli Sub Area.]
 [WCL wa4350-civ-e072-2025-26/1030][2025_WCL_349318_1]
|
Western Coalfields Limited||Wani||Wani_Civil
|
| 2. |
12-Dec-2025 10:00 AM |
23-Dec-2025 05:00 PM |
25-Dec-2025 11:00 AM |
[Providing and fixing Precast RCC pillars for strata monitoring at Bhatadi OCM under BSA of Chandrapur Area.]
 [WCL_CHA_civil_eT-083][2025_WCL_349067_1]
|
Western Coalfields Limited||CHP||CHP_Civil
|
| 3. |
11-Dec-2025 06:55 PM |
22-Dec-2025 11:00 AM |
23-Dec-2025 11:00 AM |
[Strengthening of light vehicle road by bituminous surface from junction near manager office kolgaon to takali vil-lage at kolgaon OCM under Mungoli Sub Area.]
 [WCL wa4350-civ-e070-2025-26/1026][2025_WCL_349232_1]
|
Western Coalfields Limited||Wani||Wani_Civil
|
| 4. |
11-Dec-2025 06:00 PM |
22-Dec-2025 05:00 PM |
23-Dec-2025 11:30 AM |
[Cutting and cleaning of kutcha and Pucca drain of Umrer OCM and MKD-I OCM at Umrer Sub Area.]
 [um4550-civ-0060-20256-26][2025_WCL_349260_2]
|
Western Coalfields Limited||UMR||UMR_Civil
|
| 5. |
11-Dec-2025 06:00 PM |
22-Dec-2025 05:00 PM |
23-Dec-2025 11:30 AM |
[Cutting of Garland drain at MKD-I OC Mine of Umrer Sub Area.]
 [um4550-civ-0060-20256-26][2025_WCL_349260_1]
|
Western Coalfields Limited||UMR||UMR_Civil
|
| 6. |
11-Dec-2025 04:00 PM |
22-Dec-2025 04:00 PM |
23-Dec-2025 12:00 PM |
[Providing barbed wire fencing around Pimpal-gaon village at Ukni deep OCM under Ukni-Junad Sub Area of Wani North Area. ]
 [wn4650-civ-e0119-2025-26 dt.11.12.2025][2025_WCL_349231_1]
|
Western Coalfields Limited||Wani N||Wani N_Civil
|
| 7. |
11-Dec-2025 04:00 PM |
22-Dec-2025 04:00 PM |
23-Dec-2025 12:00 PM |
[Providing water connec-tion for washing weigh bridges at Kolarpimpri open cast mine under KP-PPG Sub Area of Wani North Area]
 [wn4650-civ-e0118-2025-26 dt.11.12.2025][2025_WCL_349229_1]
|
Western Coalfields Limited||Wani N||Wani N_Civil
|
| 8. |
10-Dec-2025 06:00 PM |
22-Dec-2025 06:00 PM |
23-Dec-2025 11:00 AM |
[Supplying of available Sand / OB / Earth filled Bags at various sites as per the requirement and staking them to provide a temporary water retaining point under Newton Sub Area of Pench Area.]
 [pe3350-civ-s-e067-2025-26][2025_WCL_349164_1]
|
Western Coalfields Limited||Pench||Pench_Civil
|
| 9. |
10-Dec-2025 06:00 PM |
22-Dec-2025 06:00 PM |
23-Dec-2025 11:00 AM |
[Renovation and maintenance of existing ventilation room, pit substation, haulage room at VP UG Mine 02 under Shivpuri Sub Area of Pench Area.]
 [pe3350-civ-s-e068-2025-26][2025_WCL_349170_1]
|
Western Coalfields Limited||Pench||Pench_Civil
|
| 10. |
10-Dec-2025 05:00 PM |
22-Dec-2025 05:00 PM |
24-Dec-2025 11:00 AM |
[Construction of 14nos. complete isolation stoppings (fly-ash bricks) including all con-struction materials in CM panel W7 depillar-ing panel of Bagdona seam at Tawa Mine, Pathakhera Area, WCL.]
 [PK3550-E-MIN-0046-2025-26][2025_WCL_349185_1]
|
Western Coalfields Limited||PKD ||PKD _Mining
|
| 11. |
10-Dec-2025 11:00 AM |
26-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
[Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run and Commissioning of 2 x 7.50 MVA, 33/6.6 kV Niljai Substation on turnkey basis]
 [WCL/HQ/HOD (EnM) /2025-26/E-NIT No_02][2025_WCL_348534_1]
|
Western Coalfields Limited||HQ||HQ_E and M
|
| 12. |
09-Dec-2025 06:55 PM |
26-Dec-2025 11:00 AM |
27-Dec-2025 11:00 AM |
[Shifting of 03 Nos of weighbridges at Mungoli OCM under Mungoli Sub Area. ]
 [WCL wa4350-Civ-e069-2025-26/1024][2025_WCL_349114_1]
|
Western Coalfields Limited||Wani||Wani_Civil
|
| 13. |
09-Dec-2025 06:55 PM |
20-Dec-2025 11:00 AM |
22-Dec-2025 11:00 AM |
[Drilling of 1 No. Borewell including submersible pump for drinking purpose at Urjagram residential colony of Wani Area.]
 [WCL wa4350-civ-e068-2025-26/1014][2025_WCL_349044_2]
|
Western Coalfields Limited||Wani||Wani_Civil
|
| 14. |
09-Dec-2025 06:55 PM |
20-Dec-2025 11:00 AM |
22-Dec-2025 11:00 AM |
[Drilling construction of piezometer at Bellora Naigaon Deep OCM under Neeljay Sub Area of Wani Area]
 [WCL wa4350-civ-e068-2025-26/1014][2025_WCL_349044_1]
|
Western Coalfields Limited||Wani||Wani_Civil
|
| 15. |
09-Dec-2025 06:00 PM |
15-Dec-2025 06:00 PM |
16-Dec-2025 10:00 AM |
[Cutting and stacking of trees at Mouza Chak Tirwanja Village under BOC Mine of BSA of Chandrapur Area.]
 [WCL_CHA_civil_eT-082][2025_WCL_349058_1]
|
Western Coalfields Limited||CHP||CHP_Civil
|
| 16. |
09-Dec-2025 06:00 PM |
20-Dec-2025 05:00 PM |
22-Dec-2025 11:30 AM |
[Geotechnical investigation , collection and testing of samples and preparation of report for proposed Nallah Diversion for MKD I OC mine of Umrer Sub Area of Umrer Area.]
 [um4550-civ-0059-2025-26][2025_WCL_349115_1]
|
Western Coalfields Limited||UMR||UMR_Civil
|
| 17. |
09-Dec-2025 05:00 PM |
20-Dec-2025 05:00 PM |
22-Dec-2025 11:30 AM |
[Making RCC Hume pipe culvert at Amb nallah beside Lal puliya under Umrer Sub Area.]
 [um4550-civ-0058-2025-26][2025_WCL_349050_2]
|
Western Coalfields Limited||UMR||UMR_Civil
|
| 18. |
09-Dec-2025 05:00 PM |
20-Dec-2025 05:00 PM |
22-Dec-2025 11:00 AM |
[Loading, transportation, unloading and installation of 02 nos. of 22KW, 800mm pony belt conveyor complete with electrical accessories from 48D/7LN and 17LN/9D-10D to site of installation along with 182m belt structure, PVC belting in LWS at Tawa-II]
 [PK3550-ENM-0080-2025-26][2025_WCL_349043_1]
|
Western Coalfields Limited||PKD ||PKD _E and M
|
| 19. |
09-Dec-2025 05:00 PM |
19-Dec-2025 05:00 PM |
22-Dec-2025 11:00 AM |
[Supply of Sanitary Materials for Bungalows at Indora Complex, Koyla Vihar Colony and Administrative Building of WCL HQ, Nagpur]
 [WCL-HQ-CIV-WELFARE-E28-2025-26][2025_WCL_349018_1]
|
Western Coalfields Limited||HQ||HQ_Civil
|
| 20. |
09-Dec-2025 05:00 PM |
31-Dec-2025 05:00 PM |
02-Jan-2026 11:00 AM |
[Drivage of 03 Nos. Cross Measure stone Drifts (Rising) for crossing Fault F-1 (N) with 2 Nos. Interconnections from Seam V to Seam-V at gradient 1 in 5.75 and (2) Drivage of stone strata bunker from Seam V to Seam IV (Top) at Saoner Mine No.02 ]
 [min-e-tenderNIC-015/2025-26][2025_WCL_349002_1]
|
Western Coalfields Limited||NGP||NGP_Mining
|