| 1. |
18-Sep-2026 12:00 PM |
28-Sep-2026 12:00 PM |
29-Sep-2026 12:00 PM |
[Repairing of approach Road and Bundary wall of Raiway siding No.1 of Tilaboni Colliery under Bankola Area ]
 [ECL/GM/BA/E TENDER/26-27/Civil/ 033 Dt 18.09.2026][2026_ECL_365676_1]
|
Eastern Coalfields Limited||ECL_Bankola area
|
| 2. |
18-Sep-2026 12:00 PM |
28-Sep-2026 12:00 PM |
29-Sep-2026 12:00 PM |
[Repairing of Pot Holes of Road from CHP Gate to Bankola Railway Gate No.1 under Shyamsundarpur Colliery. ]
 [ECL/GM/BA/E TENDER/26-27/Civil/ 034 Dt 18.09.2026][2026_ECL_365677_1]
|
Eastern Coalfields Limited||ECL_Bankola area
|
| 3. |
17-Sep-2026 06:00 PM |
28-Sep-2026 06:00 PM |
29-Sep-2026 06:00 PM |
[Supply, fabrication and fitting of Guide Rope inspection and maintenance Platform for smooth and safe cage movement at Pit No. 1-2 and A-B under Pandaveswar Colliery]
 [GM-PND/EandM/26-27/95/2597 dated 16/09/2026 ][2026_ECL_365640_1]
|
Eastern Coalfields Limited||ECL_Pandaveswar area
|
| 4. |
17-Sep-2026 06:00 PM |
28-Sep-2026 06:00 PM |
29-Sep-2026 06:00 PM |
[Fabrication and repair of the piston assembly along with piston shaft of the winding engine installed at Pit No. 05 of Madhaipur Colliery]
 [GM-PND/EandM/26-27/94/2596 dated 16/09/2026][2026_ECL_365638_1]
|
Eastern Coalfields Limited||ECL_Pandaveswar area
|
| 5. |
17-Sep-2026 06:00 PM |
28-Sep-2026 06:00 PM |
29-Sep-2026 06:00 PM |
[Fabrication and repairing of 75HP endless Haulage for smooth and Safe haulage operation in R-III/II seam at Pit no. 05 in Madhaipur Colliery under Pandaveswar Area]
 [GM-PND/EandM/26-27/92/2594 dated 16/09/2026][2026_ECL_365633_1]
|
Eastern Coalfields Limited||ECL_Pandaveswar area
|
| 6. |
17-Sep-2026 06:00 PM |
28-Sep-2026 12:00 PM |
29-Sep-2026 01:00 PM |
[Repairing of hoist motor (270 KW) Sl. No. 3106 applicable for EKG 10 Rope Shovel.]
 [GM/SBA/EXCV/e-Tender/26-27/51 ][2026_ECL_365567_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 7. |
17-Sep-2026 06:00 PM |
28-Sep-2026 06:00 PM |
29-Sep-2026 06:00 PM |
[Supply and Fitting of boiler valves in breakdown and idle Boiler of Laskarbandh unit (6 Pit) at Madhaipur Colliery]
 [GM-PND/EandM/26-27/93/2595 dated 16/09/2026][2026_ECL_365635_1]
|
Eastern Coalfields Limited||ECL_Pandaveswar area
|
| 8. |
17-Sep-2026 06:00 PM |
28-Sep-2026 12:00 PM |
29-Sep-2026 01:00 PM |
[Repairing of float final drive sl no.1 for hydraulic excavator.]
 [GM/SBA/EXCV/e-Tender/26-27/50][2026_ECL_365555_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 9. |
17-Sep-2026 05:30 PM |
28-Sep-2026 06:00 PM |
29-Sep-2026 10:00 AM |
[Making and repairing of Durga Mondir shed at Ranipur Durga Mondir of Parbelia Group under Sodepur Area.]
 [SDPA/Civil/G-11/26-27/54 Dt-17.09.2026][2026_ECL_365671_1]
|
Eastern Coalfields Limited||ECL_Sodepur area
|
| 10. |
17-Sep-2026 02:00 PM |
03-Oct-2026 05:00 PM |
05-Oct-2026 10:00 AM |
[Repairing of Block no. 01, 02, 03, 05, 06, 07, 08 (NHS type) and qtr. no. 01/01, 01/02, 04/27, 04/28, 04/30, 04/32, 07/49, 07/52, 07/54 NHS type, B type 01/03 in Chopra Colony and 38/318, 38/322, 38/323, 38/324, 38/326 and 02/15 in SG section in GOCP]
 [ECL/GM/MA/CE/26-27/e-Tender/68 Dt. 16.09.2026][2026_ECL_365564_1]
|
Eastern Coalfields Limited||ECL_Mugma area
|
| 11. |
17-Sep-2026 11:00 AM |
28-Sep-2026 05:00 PM |
29-Sep-2026 11:00 AM |
[Installation of 50hp endless haulage with complete set at 5L/3D after dismantling from drift side bottom at -7L/0-1SD, installation of tugger haulage at 11D/4L after dismantling from 12L/1-2X cut for starting the production from JT21 panel of Porasco]
 [GM/Kaj/AEEnM/etender/26-27/47][2026_ECL_365616_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 12. |
17-Sep-2026 11:00 AM |
28-Sep-2026 05:00 PM |
29-Sep-2026 11:00 AM |
[Installation of Pluro II 4 stage pump and MLA 4 stage pump with electricals at 18th cross cut/3D and 13D/39L at no. 6 pit of Khas Kajora Colliery]
 [GM/Kaj/AEEnM/etender/26-27/45][2026_ECL_365610_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 13. |
17-Sep-2026 11:00 AM |
28-Sep-2026 05:00 PM |
29-Sep-2026 11:00 AM |
[Dismantling of carron endless haulage 35HP complete set from 5L and 6L along 11WD to carrying, transporting, installation in between 5L and 6L along 15WD banbahal seam at Porascole West Colliery]
 [GM/Kaj/AEEnM/etender/26-27/46][2026_ECL_365613_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 14. |
16-Sep-2026 06:00 PM |
26-Sep-2026 06:00 PM |
28-Sep-2026 11:00 AM |
[Repair of One No. CAT 773E Transmission (SL. No. 4FY07083), applicable to CAT 773E Dumper (60T).]
 [ECL/MRW/GM/AGT/2026-27/241][2026_ECL_365612_1]
|
Eastern Coalfields Limited||ECL_WS_Mugma
|
| 15. |
16-Sep-2026 05:00 PM |
26-Sep-2026 05:00 PM |
28-Sep-2026 11:00 AM |
[Replacement of existing 01 No. Outdoor type installed 800 Amp. ACB LT/415V distribution panel for Safety / Protection of Electrical Equipments of CIC Camp and Janakpur Village under Rajmahal OCP]
 [ECL/RJML/EandM/26-27/E-TEN/46 Dt. 07.09.2026][2026_ECL_365595_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 16. |
16-Sep-2026 05:00 PM |
26-Sep-2026 05:00 PM |
28-Sep-2026 11:00 AM |
[Repairing/replacement/fitting of heavy duty free flow impact pad in C16/C17 belt conveyor, replacement/repairing of discharge chute of C-17 belt conveyor etc. of Reclaim Section at Rajmahal CHP.]
 [ECL/RJML/EandM/26-27/E-TEN/43 Dt. 07.09.2026][2026_ECL_365488_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 17. |
16-Sep-2026 05:00 PM |
26-Sep-2026 05:00 PM |
28-Sep-2026 11:00 AM |
[Making of two nos of base plates for the 2500 GPM pump motor set in operation at the Deep Mine sump in ROCP mine w.r.t Rajmahal OCP under Rajmahal Area.]
 [ECL/RJML/EandM/26-27/E-TEN/44 Dt. 07.09.2026][2026_ECL_365490_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 18. |
16-Sep-2026 05:00 PM |
26-Sep-2026 05:00 PM |
28-Sep-2026 11:00 AM |
[Laying of 6 / 2 inch dia M.S./G.I. Pipes, for making arrangements for fire fighting at the Kendua Coal Stock and the Old Dozer section Coal Stock, near the Zero Point, R.O.C.P., w.r.t. R.O.C.P., under Rajmahal Area.]
 [ECL/RJML/EandM/26-27/E-TEN/45 Dt. 07.09.2026][2026_ECL_365579_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 19. |
16-Sep-2026 05:00 PM |
26-Sep-2026 05:00 PM |
28-Sep-2026 11:00 AM |
[Replacement of 200 mtr conveyor belt in C19 and 20 mtrs belt in C17 repairing, replacement of bearing and its related parts in take up pulley of C19 and bend pulley of C17, replacement of fluid coupling flange and driving plate C19 drive drum etc.]
 [ECL/RJML/EandM/26-27/E-TEN/42 Dt. 07.09.2026][2026_ECL_365487_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 20. |
16-Sep-2026 05:00 PM |
28-Sep-2026 05:00 PM |
29-Sep-2026 11:00 AM |
[Thorough repairing of CEQ-Type (5 units)(quarter no- CEQ-4/1,4/5,4/6,6/3,7/2) quarters under Block Repair at C H Kalla Colony ]
 [ECL/CHK/CE/e-tender/26-27/03 dt.11.09.2026][2026_ECL_365346_1]
|
Eastern Coalfields Limited||ECL_CH Kalla
|