| 1. |
22-Nov-2025 06:00 PM |
03-Dec-2025 11:00 AM |
04-Dec-2025 11:00 AM |
[Installation of Three reels (600 mtr.) 1200mm belt in 2nd belt conveyor(Main Incline) and Twelve reels (2400 mtr.) 1000mm belt of LHCM-2 belt conveyors running at 3n4 Incline unit, J.P.Colly.]
 [ECL/GM/JNR/EnM/A2/25-26/95 dated 18.11.2025][2025_ECL_347748_1]
|
Eastern Coalfields Limited||ECL_Jhanjra area
|
| 2. |
22-Nov-2025 06:00 PM |
03-Dec-2025 11:00 AM |
04-Dec-2025 11:00 AM |
[Installation of 790mtr. track line including transportation of 30lb rail and wooden sleeper, laying, fitting from 73L,4R to 68L,22R in panel11 at LHCM1 section at R-VIIA seam]
 [ECL/GM/JNR/EnM/A2/25-26/94 dated 18.11.2025][2025_ECL_347746_1]
|
Eastern Coalfields Limited||ECL_Jhanjra area
|
| 3. |
22-Nov-2025 12:00 PM |
02-Dec-2025 05:00 PM |
03-Dec-2025 11:00 AM |
[Conducting Drone-Based Demographic Survey and preparation of a detailed surface map, Plot/ House Hold wise Physical status verification. Composition with PJOC and PW U/G working Plan after Preparation and Updating, showing current surface status ]
 [GM/KAJ/PCD/25-26/5001 Date 04.11.2025][2025_ECL_347921_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 4. |
22-Nov-2025 12:00 PM |
02-Dec-2025 05:00 PM |
03-Dec-2025 11:00 AM |
[Lifting of existing old damaged pipes and lowering of new seamless pipes 150mm dia and 225m length in vertical stowing range of Bunker No. 2 at Jambad UG Colliery ]
 [GM/KAJ/PCD/25-26/5002 Date 04.11.2025][2025_ECL_347922_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 5. |
22-Nov-2025 11:00 AM |
02-Dec-2025 05:00 PM |
03-Dec-2025 11:00 AM |
[Side stitching of pillars in the panel CN-8(A) Bottom section in Chora (R-VI) Seam, No.6 Pit, Khas Kajora Colliery]
 [GM/KAJ/PCD/25-26/5000 Date 04.11.2025 ][2025_ECL_347892_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 6. |
22-Nov-2025 10:00 AM |
02-Dec-2025 10:00 AM |
03-Dec-2025 10:00 AM |
[Laying 4 M.S. Pipe line for dewatering from coalface to garland drain on surface at C.L. Jambad OCP]
 [GM/KND/AE(ENM)/55(TN)/25-26/50][2025_ECL_347907_1]
|
Eastern Coalfields Limited||ECL_Kenda area
|
| 7. |
21-Nov-2025 06:00 PM |
08-Dec-2025 06:00 PM |
09-Dec-2025 11:00 AM |
[Cleaning and material handling jobs at different places of store under SB Project.]
 [GM/SBA/CE/e-Tender/25-26/32 Dated 20-11-2025][2025_ECL_347796_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 8. |
21-Nov-2025 06:00 PM |
08-Dec-2025 06:00 PM |
09-Dec-2025 11:00 AM |
[Deep Screening along with supply of ballast and signalling gears updation work at Sonepur Bazari Siding.]
 [GM/SBA/CE/e-Tender/25-26/31 Dated 20-11-2025][2025_ECL_347795_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 9. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Fabrication and repairing of both side (LHS and RHS) rear gate of 7820 Dragline]
 [GM/SBA/EXCV/e-Tender/25-26/133][2025_ECL_347836_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 10. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Repairing of Bell Bar(Yoke) nomenclature B39 applicable for EKG 10 Rope shovel.]
 [GM/SBA/EXCV/e-Tender/25-26/131 ][2025_ECL_347819_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 11. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Off-loading work towards removal, dismantling, assembling and fitment of27.00X49, 24.00X35 and 18.00X25 size OTR tyre for period of 360 days.]
 [GM/SBA/EXCV/e-Tender/25-26/129][2025_ECL_347800_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 12. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Repairing of front idler assy. float for BE1000-1 Hydraulic Excavator(Sl no. 1 and Sl no.2).]
 [GM/SBA/EXCV/e-Tender/25-26/132][2025_ECL_347835_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 13. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Regular welding work for running and preventive maintenance of all Dozers for one year, i.e. 365 Days.]
 [GM/SBA/EXCV/e-Tender/25-26/130][2025_ECL_347803_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 14. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Repairing of RHS rear Wall and RHS Counter Weight Housing of EKG 10 Cum Rope Shovel sl. No. 541.]
 [GM/SBA/EXCV/e-Tender/25-26/134][2025_ECL_347838_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 15. |
20-Nov-2025 06:55 PM |
01-Dec-2025 06:55 PM |
02-Dec-2025 12:00 PM |
[Construction of 01 nos. pump house near Plot no.629 at Lohandia rehab site under Rajmahal Area.]
 [ECL/RJML/AGM/AE(C)/ e-Ten/25-26/343 Dt-20.11.2025][2025_ECL_347821_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 16. |
20-Nov-2025 06:55 PM |
05-Dec-2025 06:55 PM |
06-Dec-2025 12:00 PM |
[Installation of water treatment plant along with complete arrangements for water supply at Dumaria rehab site (Taljhari village) under Rajmahal Area.]
 [ECL/RJML/AGM/AE(C)/ e-Ten/25-26/321 Dt-20.11.2025][2025_ECL_347802_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 17. |
20-Nov-2025 06:55 PM |
01-Dec-2025 06:55 PM |
02-Dec-2025 12:00 PM |
[Drilling and commissioning of 04 nos. Hand pump at different places of Hijukita (JB No-02) rehab site under Rajmahal Area.]
 [ECL/RJML/AGM/AE(C)/ e-Ten/25-26/338 Dt-20.11.2025][2025_ECL_347804_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 18. |
20-Nov-2025 06:55 PM |
01-Dec-2025 06:55 PM |
02-Dec-2025 12:00 PM |
[Engagement of water tanker for supplying of water for drinking purpose from Barat Ghar to down side plot at OB Dump rehab site for the period of 365 days under Rajmahal Area.]
 [ECL/RJML/AGM/AE(C)/ e-Ten/25-26/339 Dt-20.11.2025][2025_ECL_347805_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 19. |
20-Nov-2025 06:55 PM |
01-Dec-2025 06:55 PM |
02-Dec-2025 12:00 PM |
[Repairing of Quarters B-Type D/S no 386 and 444 Urjanagar colony in Rajmahal Area.]
 [ECL/RJML/AGM/AE(C)/ e-Ten/25-26/340 Dt-20.11.2025][2025_ECL_347807_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|
| 20. |
20-Nov-2025 06:55 PM |
01-Dec-2025 06:55 PM |
02-Dec-2025 12:00 PM |
[Engagement of water tanker for supply of water for drinking purpose at Lalmatia colony rehab site (Masjid area and Sabir grp) for the period of 365 days under Rajmahal Area.]
 [ECL/RJML/AGM/AE(C)/ e-Ten/25-26/344 Dt-20.11.2025][2025_ECL_347824_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|