| 1. |
25-Nov-2025 06:00 PM |
06-Dec-2025 05:00 PM |
08-Dec-2025 11:00 AM |
[Repairing of workshop (mechanical and electrical) and Changing of Damaged CGI Sheet and other allied work, Kamarsal, Substation at Satgram Incline under Satgram Sripur Area.]
 [ECL/SSA/GM/AE(C)/e-T/25-26/59 date 21.11.2025][2025_ECL_348056_1]
|
Eastern Coalfields Limited||ECL_Satgram area
|
| 2. |
25-Nov-2025 06:00 PM |
06-Dec-2025 05:00 PM |
08-Dec-2025 11:00 AM |
[Repairing of old damage floors of GM bunglow by Vitrified floor tiles and bathroom of first floor under satgram sripur area]
 [ECL/SSA/GM/AE(C)/e-T/25-26/60 date 21.11.2025][2025_ECL_348057_1]
|
Eastern Coalfields Limited||ECL_Satgram area
|
| 3. |
25-Nov-2025 02:00 PM |
11-Dec-2025 05:00 PM |
12-Dec-2025 10:00 AM |
[Widening and Re-carpeting of road from NH2 to Goplapura colony under Mugma Area (2200.00 mtr.).]
 [ECL/GM/MA/CE/25-26/eTender/178 Dt. 24.11.2025][2025_ECL_347977_1]
|
Eastern Coalfields Limited||ECL_Mugma area
|
| 4. |
25-Nov-2025 09:00 AM |
09-Dec-2025 09:00 AM |
10-Dec-2025 09:00 AM |
[Repairing of 18 Nos Cylinder Head Assy of BEML Make BS6D170-I and BSA6D170-I Model Engines and Repair and Calibration of 12 Nos Nozzle holder assemblies suitable for BSA6D170 Engines applicable to BEML make BE1000 Hydraulic Excavators.]
 [ECL/URW/e-Tender/Rep/25-26/550 dt. 19.11.2025][2025_ECL_347894_1]
|
Eastern Coalfields Limited||ECL_WS_Ukhra
|
| 5. |
24-Nov-2025 05:00 PM |
05-Dec-2025 05:00 PM |
06-Dec-2025 11:30 AM |
[Repairing of road from Bansra C Pit to Bansra Siding through Aambagan of Bansra Colliery under Kunustoria Area]
 [ECL/GM/KNT/CIVIL/E-TENDER/ 25-26/524 Dt. 18-11-2025][2025_ECL_347725_1]
|
Eastern Coalfields Limited||ECL_Kunostoria area
|
| 6. |
22-Nov-2025 06:00 PM |
03-Dec-2025 11:00 AM |
04-Dec-2025 11:00 AM |
[Installation of Three reels (600 mtr.) 1200mm belt in 2nd belt conveyor(Main Incline) and Twelve reels (2400 mtr.) 1000mm belt of LHCM-2 belt conveyors running at 3n4 Incline unit, J.P.Colly.]
 [ECL/GM/JNR/EnM/A2/25-26/95 dated 18.11.2025][2025_ECL_347748_1]
|
Eastern Coalfields Limited||ECL_Jhanjra area
|
| 7. |
22-Nov-2025 06:00 PM |
03-Dec-2025 11:00 AM |
04-Dec-2025 11:00 AM |
[Installation of 790mtr. track line including transportation of 30lb rail and wooden sleeper, laying, fitting from 73L,4R to 68L,22R in panel11 at LHCM1 section at R-VIIA seam]
 [ECL/GM/JNR/EnM/A2/25-26/94 dated 18.11.2025][2025_ECL_347746_1]
|
Eastern Coalfields Limited||ECL_Jhanjra area
|
| 8. |
22-Nov-2025 12:00 PM |
02-Dec-2025 05:00 PM |
03-Dec-2025 11:00 AM |
[Conducting Drone-Based Demographic Survey and preparation of a detailed surface map, Plot/ House Hold wise Physical status verification. Composition with PJOC and PW U/G working Plan after Preparation and Updating, showing current surface status ]
 [GM/KAJ/PCD/25-26/5001 Date 04.11.2025][2025_ECL_347921_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 9. |
22-Nov-2025 12:00 PM |
02-Dec-2025 05:00 PM |
03-Dec-2025 11:00 AM |
[Lifting of existing old damaged pipes and lowering of new seamless pipes 150mm dia and 225m length in vertical stowing range of Bunker No. 2 at Jambad UG Colliery ]
 [GM/KAJ/PCD/25-26/5002 Date 04.11.2025][2025_ECL_347922_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 10. |
22-Nov-2025 11:00 AM |
02-Dec-2025 05:00 PM |
03-Dec-2025 11:00 AM |
[Side stitching of pillars in the panel CN-8(A) Bottom section in Chora (R-VI) Seam, No.6 Pit, Khas Kajora Colliery]
 [GM/KAJ/PCD/25-26/5000 Date 04.11.2025 ][2025_ECL_347892_1]
|
Eastern Coalfields Limited||ECL_Kajora area
|
| 11. |
22-Nov-2025 10:00 AM |
02-Dec-2025 10:00 AM |
03-Dec-2025 10:00 AM |
[Laying 4 M.S. Pipe line for dewatering from coalface to garland drain on surface at C.L. Jambad OCP]
 [GM/KND/AE(ENM)/55(TN)/25-26/50][2025_ECL_347907_1]
|
Eastern Coalfields Limited||ECL_Kenda area
|
| 12. |
21-Nov-2025 06:00 PM |
08-Dec-2025 06:00 PM |
09-Dec-2025 11:00 AM |
[Deep Screening along with supply of ballast and signalling gears updation work at Sonepur Bazari Siding.]
 [GM/SBA/CE/e-Tender/25-26/31 Dated 20-11-2025][2025_ECL_347795_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 13. |
21-Nov-2025 06:00 PM |
08-Dec-2025 06:00 PM |
09-Dec-2025 11:00 AM |
[Cleaning and material handling jobs at different places of store under SB Project.]
 [GM/SBA/CE/e-Tender/25-26/32 Dated 20-11-2025][2025_ECL_347796_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 14. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Fabrication and repairing of both side (LHS and RHS) rear gate of 7820 Dragline]
 [GM/SBA/EXCV/e-Tender/25-26/133][2025_ECL_347836_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 15. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Repairing of Bell Bar(Yoke) nomenclature B39 applicable for EKG 10 Rope shovel.]
 [GM/SBA/EXCV/e-Tender/25-26/131 ][2025_ECL_347819_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 16. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Repairing of front idler assy. float for BE1000-1 Hydraulic Excavator(Sl no. 1 and Sl no.2).]
 [GM/SBA/EXCV/e-Tender/25-26/132][2025_ECL_347835_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 17. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Off-loading work towards removal, dismantling, assembling and fitment of27.00X49, 24.00X35 and 18.00X25 size OTR tyre for period of 360 days.]
 [GM/SBA/EXCV/e-Tender/25-26/129][2025_ECL_347800_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 18. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Repairing of RHS rear Wall and RHS Counter Weight Housing of EKG 10 Cum Rope Shovel sl. No. 541.]
 [GM/SBA/EXCV/e-Tender/25-26/134][2025_ECL_347838_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 19. |
21-Nov-2025 12:00 PM |
02-Dec-2025 12:00 PM |
03-Dec-2025 01:00 PM |
[Regular welding work for running and preventive maintenance of all Dozers for one year, i.e. 365 Days.]
 [GM/SBA/EXCV/e-Tender/25-26/130][2025_ECL_347803_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
| 20. |
20-Nov-2025 06:55 PM |
01-Dec-2025 06:55 PM |
02-Dec-2025 12:00 PM |
[Temporary arrangement of church with toilet and bathroom at Taljhari village under Rajmahal Area.]
 [ECL/RJML/AGM/AE(C)/ e-Ten/25-26/346 Dt-20.11.2025][2025_ECL_347833_1]
|
Eastern Coalfields Limited||ECL_Rajmahal area
|