1. |
23-Oct-2025 06:55 PM |
03-Nov-2025 10:00 AM |
04-Nov-2025 11:00 AM |
[Day to day operation, Repair and maintenance of fixed Water sprinklers System at Dakra Railway Siding for period of 02 Years under Dakra Project,NK Area.]
 [SO(C)/NK/e-tender/25-26/268][2025_CCL_346093_1]
|
Central Coalfields Limited||NK Dakara
|
2. |
23-Oct-2025 06:55 PM |
03-Nov-2025 03:00 PM |
04-Nov-2025 10:00 AM |
[Provision of biodegradable toilet at different location(06 nos.) under Dhori Area of GM unit Dhori Area.]
 [GM(D)/SO(C) /E-tender/2025-26/29 dt 23.10.2025][2025_CCL_346089_1]
|
Central Coalfields Limited||Dhori
|
3. |
23-Oct-2025 06:00 PM |
10-Nov-2025 05:00 PM |
11-Nov-2025 11:00 AM |
[Comprehensive Annual Maintenance Contract work for Charhi Colony under GM Unit of Hazaribagh Area for a period of 2 years]
 [GM(H)/SO(C)/NIT/2025-26/18 Dated 23-10-2025][2025_CCL_346086_1]
|
Central Coalfields Limited||Hazaribag
|
4. |
23-Oct-2025 06:00 PM |
03-Nov-2025 05:00 PM |
04-Nov-2025 10:00 AM |
[Repairing of both side final drive assy. of BH60M Sl.no. 60937 Dumper of Religara Project.]
 [SO(X)(A)/e-NIT/54/25-26/162][2025_CCL_346132_1]
|
Central Coalfields Limited||Argada
|
5. |
23-Oct-2025 06:00 PM |
03-Nov-2025 05:00 PM |
04-Nov-2025 10:00 AM |
[Complete Repairing and reconditioning of 3.3 KV Electrotecnika make field switch and electrical safety features of LnT CK-300E Shovel sl.no.169 (E) of Sirka OCP.]
 [SO(X)(A)/e-NIT/52/25-26/159][2025_CCL_346119_1]
|
Central Coalfields Limited||Argada
|
6. |
23-Oct-2025 06:00 PM |
03-Nov-2025 03:00 PM |
04-Nov-2025 04:00 PM |
[Repairing OF SHEETING AT SUB STATION AND EXCAVATION SHED UNDER JARANGDIH COLLIERY]
 [PO/JRD/PE (C)/E-Tender/25-26/09 Dt-23.10.2025][2025_CCL_346091_1]
|
Central Coalfields Limited||Kathara
|
7. |
23-Oct-2025 06:00 PM |
04-Nov-2025 11:00 AM |
05-Nov-2025 11:00 AM |
[Repairing and new making of 04 nos. end cover dala both side (DE and NDE) for 14KW motor, Volt-415, 3 Phase, RPM-1460 vertical motor, (B)repairing and reconditioning of end cover dala both side (DE and NDE) of 11 KW motor, Volt-415, RPM-975 and (C)pa]
 [PO/KTW/EnM/eTen/25-26/80 Dated-23.10.2025][2025_CCL_346090_1]
|
Central Coalfields Limited||Kathara
|
8. |
23-Oct-2025 06:00 PM |
04-Nov-2025 11:00 AM |
05-Nov-2025 11:00 AM |
[Complete repairing/rewinding of different types and different capacity of induction motors, Volt-415, 3Phase, (A)40 KW, RPM-1470, SL No. 756, Make-Russian, (B)22 KW, RPM-1460, SI No.(i)WNP U No.249 and (ii)WNPUNo. 247]
 [PO/KTW/EnM/eTen/25-26/79 Dated-23.10.2025][2025_CCL_346084_1]
|
Central Coalfields Limited||Kathara
|
9. |
23-Oct-2025 06:00 PM |
04-Nov-2025 11:00 AM |
05-Nov-2025 11:00 AM |
[Dismantling, repairing/rewinding and assembling of different types and different capacity of induction motors, Volt-415, 3Phase, (i) 55 KW, RPM-985, SI No. WNP (U/N-241), Make-Russian, (ii) 40 KW, RPM-1460, SI No. WNP (U No.348 H/C), Make-Russian (ii]
 [PO/KTW/EnM/eTen/25-26/78 Dated-23.10.2025][2025_CCL_346082_1]
|
Central Coalfields Limited||Kathara
|
10. |
23-Oct-2025 06:00 PM |
03-Nov-2025 04:00 PM |
04-Nov-2025 11:00 AM |
[Providing and fixing Bio- Toilet at different location of Karo OCP, Bokaro colliery and AKK OCP With 24 months periodic maintenance period under BnK, Area.]
 [PE(C)/AKKOCP/E -Tender/25-26/08, dated- 22.10.2025][2025_CCL_346078_1]
|
Central Coalfields Limited||B&K
|
11. |
23-Oct-2025 06:00 PM |
03-Nov-2025 09:00 AM |
04-Nov-2025 09:00 AM |
[AMC of 05 (five) nos. of 50 Te capacity Digital make (WB no. 01, 02, 03, 04) and global make (JRD siding WB no. 01) Electronic road weighbridge for one year (365 days) installed at AKKOCP BnK Area]
 [PE(EnM)/AKK OCP/e-tender/25-26/34 ][2025_CCL_346135_1]
|
Central Coalfields Limited||B&K
|
12. |
23-Oct-2025 06:00 PM |
03-Nov-2025 05:00 PM |
04-Nov-2025 10:00 AM |
[Repairing of engine safety guard along with rod wrench foundation, fixing and fitting of asbestos muffler and safety wire in exhaust system, repairing of oil cooler, fuel tank and its mounting, Air cleaner housing and its foundation, Railing and ladd]
 [SO(X)(A)/e-NIT/53/25-26/160][2025_CCL_346123_1]
|
Central Coalfields Limited||Argada
|
13. |
23-Oct-2025 05:00 PM |
03-Nov-2025 11:00 AM |
04-Nov-2025 11:00 AM |
[Provision of WBM road near Solar plant in Kalyanpur including kaccha drain under Ashok OCP, Piparwar Area.]
 [GM(PPR)/Civil/E-tender/2025-26 /1615 ][2025_CCL_346094_1]
|
Central Coalfields Limited||Piparwar
|
14. |
23-Oct-2025 05:00 PM |
04-Nov-2025 05:00 PM |
05-Nov-2025 10:00 AM |
[Repairing of (a) Hoist coupling, equalizer sheave yoke assembly and damaged hoist pulley collar and (b) RHS Drive shaft and driving wheel of EKG 5A shovel Sl. No. 581 of Jharkhand OCP.]
 [PE(X)/JOCP/NIT/25-26/36 Dated 23.10.2025][2025_CCL_346081_1]
|
Central Coalfields Limited||Hazaribag
|
15. |
23-Oct-2025 05:00 PM |
03-Nov-2025 11:00 AM |
04-Nov-2025 11:00 AM |
[Providing boundary wall around Dewta Asthal near Bargad tree at R.R. site new Bijain under Ashok OCP, Piparwar Area.]
 [GM(PPR)/Civil/E-tender/2025-26 /1616 ][2025_CCL_346098_1]
|
Central Coalfields Limited||Piparwar
|
16. |
23-Oct-2025 05:00 PM |
03-Nov-2025 06:00 PM |
04-Nov-2025 10:30 AM |
[Daily Cleaning of spilled over coal, mud ,debris etc from under and around the weighbridge platforms and daily housekeeping of weighbridge rooms for the period of 1 year at Sayal-D Project.]
 [PE(EnM)/SYL-D/eTender/25-26/26][2025_CCL_346103_1]
|
Central Coalfields Limited||Barka Syal
|
17. |
23-Oct-2025 05:00 PM |
04-Nov-2025 05:00 PM |
05-Nov-2025 10:00 AM |
[Repairing of (a) feed system sprockets, their pins and respective housings and (b) cabin and its gate along with glass fitting of drill machine REL 2109 of Jharkhand OCP.]
 [PE(X)/JOCP/NIT/25-26/35 Dated - 23.10.2025][2025_CCL_346079_1]
|
Central Coalfields Limited||Hazaribag
|
18. |
23-Oct-2025 05:00 PM |
04-Nov-2025 05:00 PM |
05-Nov-2025 10:00 AM |
[Repairing of operator cabin with glass fitment and Repairing of Blade assembly, Blade arm, Trunion, Diagonal, End bit, Cutting edge and Centre plate and tilt cylinder housing with pins of WD600 Wheel dozer sl. no. 50454 of Jharkhand OCP.]
 [PE(X)/JOCP/NIT/25-26/34 Dated -23 .10.2025][2025_CCL_346076_1]
|
Central Coalfields Limited||Hazaribag
|
19. |
23-Oct-2025 10:00 AM |
04-Nov-2025 10:00 AM |
05-Nov-2025 10:00 AM |
[Erection of 3.3KV OH line at IV seam and improving illumination at Coal stock, pumping site and Haul road at KOCP under Hazaribagh Area.]
 [PO/KOCP/EnM/Tender/25 26/10][2025_CCL_346052_1]
|
Central Coalfields Limited||Hazaribag
|
20. |
22-Oct-2025 06:00 PM |
01-Nov-2025 11:00 AM |
03-Nov-2025 11:00 AM |
[iring / overhauling, changing of fluid coupling of ROM B/C, fabrication and changing of flange coupling of gear boxes of A and B side feeder, By Pass B/C, Picking B/C, Transfer B/C, A and B side shuttle conveyor, wheel shaft and changing of tyre coup]
 [SGW/KTA/ENM/E-Tender/25-26/59 Date 22.10.2025][2025_CCL_346055_1]
|
Central Coalfields Limited||Kathara
|