Logo
Notices eProcurement System of Coal India Limited
 
 
The latest Tender documents issued by various Government Departments, Directorates, Organisations, Institutions and local bodies of Coal India Limited-CIL are listed here.
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 31-Mar-2026 06:55 PM 11-Apr-2026 11:00 AM 13-Apr-2026 11:00 AM [3.3 KV OH line re-organization, insulator changing and replacement of damaged poles of pump feeder at 6 no departmental patch at AADOCM Project Dhori Area]
 [GM(D)/SO(EnM)/NIT/2025-26/43 dtd- 31.03.2026][2026_CCL_357822_1]
Central Coalfields Limited||Dhori
2. 31-Mar-2026 06:55 PM 11-Apr-2026 06:55 PM 13-Apr-2026 10:00 AM [Complete repairing, rectification and overhauling works of one (01) no. stainless steel body, Kirloskar make, multistage RKB pumps, 180 Mtr head 500 GPM for mine dewatering in respect of Dhori (K) colliery of Dhori Area]
 [PO/D(K)/EnM/Tender/25-26/11][2026_CCL_357812_1]
Central Coalfields Limited||Dhori
3. 31-Mar-2026 06:55 PM 11-Apr-2026 09:00 AM 13-Apr-2026 11:00 AM [Erection of feeding poles with LT isolation system with all electrical safety features and fresh wiring in Doctor chambers, male ward, female ward, child word, waiting hall at Central Hospital, Dhori Area]
 [GM(D)/SO(EnM)/NIT/25-26/38][2026_CCL_357845_1]
Central Coalfields Limited||Dhori
4. 31-Mar-2026 06:55 PM 11-Apr-2026 03:00 PM 13-Apr-2026 10:00 AM [Repair and extension of existing guard walls at porta cabins of SDOCM and AADOCM under GM Unit of Dhori Area.]
 [GM(D)/SO(C)/ E-tender/2025-26/50 dt 31.03.2026][2026_CCL_357821_1]
Central Coalfields Limited||Dhori
5. 31-Mar-2026 06:55 PM 11-Apr-2026 11:00 AM 13-Apr-2026 11:00 AM [Re-organization of 8 inch dia pipeline double range at 6 no sump in respect of AADOCM of Dhori Area]
 [GM(D)/SO(EnM)/NIT/2025-26/44 dtd- 31.03.2026][2026_CCL_357842_1]
Central Coalfields Limited||Dhori
6. 31-Mar-2026 06:55 PM 16-Apr-2026 03:00 PM 17-Apr-2026 10:00 AM [Day to Day repairing and renovation of quarters with severe deterioration or shifting case of Staff Quarter Colony under AADOCM of Dhori Area.]
 [GM(D)/SO(C)/ E-tender/2025-26/51 dt 31.03.2026][2026_CCL_357837_1]
Central Coalfields Limited||Dhori
7. 31-Mar-2026 06:55 PM 10-Apr-2026 09:00 AM 11-Apr-2026 09:00 AM [Repairing of 04 nos HT motor]
 [AADOCM/ENM/25-26/13][2026_CCL_357853_1]
Central Coalfields Limited||Dhori
8. 31-Mar-2026 06:50 PM 16-Apr-2026 05:00 PM 17-Apr-2026 11:00 AM [Annual repair and maintenance of civil works at DHC under welfare and services department, CCL, HQ. Ranchi, for the period of two years.]
 [CCL/GM(WnS)/NIT/25-26/7284-93 Dt. 30.03.2026][2026_CCL_357811_1]
Central Coalfields Limited||HQ CSR N TA
9. 31-Mar-2026 06:50 PM 13-Apr-2026 05:00 PM 14-Apr-2026 11:30 AM [Modification in classrooms of CCL KE LAL and CCL KI LAADLI Study centre, Gandhinagar Colony, CCL, Ranchi. .]
 [CCL/GM(WnS)/NIT/25-26/7319-28 Dt. 30.03.2026][2026_CCL_357825_1]
Central Coalfields Limited||HQ CSR N TA
10. 31-Mar-2026 06:30 PM 11-Apr-2026 05:00 PM 13-Apr-2026 10:00 AM [Onsite electrical repair and maintenance of three (03) nos. Starters 3.3KV grade, 200 Amps engaged for starting of various pumps i) 3.3KV 200Amps Andrew Yule make currently engaged at coal Pump station, ii) 3.3KV 200Amps starter engaged at DD mines]
 [CCL/BnK/Bokaro/EnM/25-26/22][2026_CCL_357843_4]
Central Coalfields Limited||B&K
11. 31-Mar-2026 06:30 PM 11-Apr-2026 05:00 PM 13-Apr-2026 10:00 AM [Shifting, lowering and installation of 2000/1200/1000 GPM pump set with all electricals during monsoon as and when required basis in respect of Bokaro Colliery]
 [CCL/BnK/Bokaro/EnM/25-26/22][2026_CCL_357843_7]
Central Coalfields Limited||B&K
12. 31-Mar-2026 06:30 PM 11-Apr-2026 05:00 PM 13-Apr-2026 10:00 AM [Complete mechanical repairing of 165 KW, 3.3 kV, 3phase, 4pole, GEC make and 175 KW ,3.3 KV,3 phase ,4 pole kirloskar make Induction motor used in pumping operation at different location of mines w.r.t Bokaro Colliery, BNK Area]
 [CCL/BnK/Bokaro/EnM/25-26/22][2026_CCL_357843_2]
Central Coalfields Limited||B&K
13. 31-Mar-2026 06:30 PM 11-Apr-2026 05:00 PM 13-Apr-2026 10:00 AM [Re organisation of 300 mtr 8 inch dia Delivery pipeline from coal sump to main sump during upcoming monsoon at Bokaro colliery]
 [CCL/BnK/Bokaro/EnM/25-26/22][2026_CCL_357843_1]
Central Coalfields Limited||B&K
14. 31-Mar-2026 06:30 PM 11-Apr-2026 05:00 PM 13-Apr-2026 10:00 AM [Repairing and complete overhauling of flowmore 1200 and MnP 1000 GPM capacity pump for D D mines dewatering during upcoming monsoon FY-2026-27 in respect of Bokaro Colliery]
 [CCL/BnK/Bokaro/EnM/25-26/22][2026_CCL_357843_3]
Central Coalfields Limited||B&K
15. 31-Mar-2026 06:30 PM 11-Apr-2026 05:00 PM 13-Apr-2026 10:00 AM [Pre monsoon repair and maintenance, re-organisation of dedicated 3.3KV pump feeder from coal face to the pumping station and extension of the lines as per requirement during the monsoon in respect of Bokaro Colliery, BNK Area]
 [CCL/BnK/Bokaro/EnM/25-26/22][2026_CCL_357843_5]
Central Coalfields Limited||B&K
16. 31-Mar-2026 06:30 PM 11-Apr-2026 05:00 PM 13-Apr-2026 10:00 AM [Repairing, maintenance and fabrication of baseplates for 3 nos. pump namely 2000gpm, 2x1000 GPM pumps for smooth operation in respect of Bokaro Colliery]
 [CCL/BnK/Bokaro/EnM/25-26/22][2026_CCL_357843_6]
Central Coalfields Limited||B&K
17. 31-Mar-2026 06:00 PM 11-Apr-2026 03:00 PM 13-Apr-2026 11:00 AM [Providing and fixing of 24 nos. Hume pipe 1000 mm dia (NP-4) different locations in mines and cleaning n repairing of existing garland drains of length 2150 m and cutting of new garland drains of length 680m. at different locations in mine for monsoo]
 [GM(K)/SO(C)/e-NIT/2025-26/649][2026_CCL_357835_1]
Central Coalfields Limited||Kuju
18. 31-Mar-2026 06:00 PM 11-Apr-2026 03:00 PM 13-Apr-2026 11:00 AM [Providing and fixing of 40 nos. Hume pipe (1000 mm dia) NP-4 at different locations in mines and Cleaning repairing of existing garland drains of length 1000.00 m and cutting of new garland drains of length 2000.00 m, at different locations in mine]
 [GM(K)/SO(C)/e-NIT/2025-26/650][2026_CCL_357844_1]
Central Coalfields Limited||Kuju
19. 31-Mar-2026 06:00 PM 11-Apr-2026 03:00 PM 13-Apr-2026 04:00 PM [Cleaning of Garland drain, pucca drain near Pit Office, base workshop and unit store, Kutcha drain cutting along the haul road at Kathara mines under Kathara Colliery, Kathara Area]
 [PO/KTC/PE (C)/E-Tender/25-26/09 Dt-31.03.2026][2026_CCL_357834_1]
Central Coalfields Limited||Kathara
20. 31-Mar-2026 06:00 PM 11-Apr-2026 03:00 PM 13-Apr-2026 11:00 AM [Providing and fixing of 16 nos. 1000 mm dia NP-4 Hume pipe at different locations in mines and Cleaning of settling tank of volume 270.00 cum and Cleaning repairing of existing garland drain of length 1645.00 m and cutting of new garland drain of l]
 [GM(K)/SO(C)/e-NIT/2025-26/648][2026_CCL_357833_1]
Central Coalfields Limited||Kuju
Visitor No:6656433
Contents owned and maintained by Coal India Limited and its subsidiaries of Coal India Limited