| 1. |
01-Apr-2026 06:55 PM |
13-Apr-2026 11:00 AM |
14-Apr-2026 11:00 AM |
[A Complete repairing of two nos 2000GPM and pluro 2chrs 150m head mandp make multistage pump B Complete repairing of two nos 1000GPM 1000m head mnp make multistage pump assembly at AADOCM , Dhroi Area.]
 [GM(D)/SO(EnM)/NIT/2026-27/01 dtd- 01.04.2026][2026_CCL_357894_1]
|
Central Coalfields Limited||Dhori
|
| 2. |
01-Apr-2026 06:55 PM |
13-Apr-2026 10:00 AM |
14-Apr-2026 11:00 AM |
[Cleaning of existing drain (4000.00 mtrs) along the Haul Road of KDH Mines Under KDH Project,NK Area.]
 [SO(C)/NK/e-tender/26-27/01][2026_CCL_357890_1]
|
Central Coalfields Limited||NK Dakara
|
| 3. |
01-Apr-2026 06:55 PM |
13-Apr-2026 10:00 AM |
14-Apr-2026 11:00 AM |
[Cleaning of 1000 meters of garland drain, Drain cutting of 750 Meters, Construction of Pillar for dump stability and Construction of a pump foundation at Purnadih Project under Purnadih Project,NK Area.]
 [SO(C)/NK/e-tender/25-26/02][2026_CCL_357899_1]
|
Central Coalfields Limited||NK Dakara
|
| 4. |
01-Apr-2026 06:55 PM |
13-Apr-2026 11:00 AM |
14-Apr-2026 11:00 AM |
[Repair and maintenance of 02 nos motor installed in 3P sump and 02 nos motor installed for face pumping under SDOCM Project of Dhori Area ]
 [GM(D)/SO(EnM)/NIT/2026-27/02 dtd- 01.04.2026][2026_CCL_357891_1]
|
Central Coalfields Limited||Dhori
|
| 5. |
01-Apr-2026 06:00 PM |
11-Apr-2026 11:00 AM |
13-Apr-2026 11:00 AM |
[Maintenance and erection of safety equipment/devices at main substation and colony substation before monsoon of TSOCP under Hzb Area]
 [GM(H)/EnM/Tender/26-27/01][2026_CCL_357893_1]
|
Central Coalfields Limited||Hazaribag
|
| 6. |
01-Apr-2026 06:00 PM |
11-Apr-2026 05:00 PM |
13-Apr-2026 10:00 AM |
[Repairing of rear connecting rod pin and bush hole, repairing of front A frame Mak-ing and fabrication eye hole and pin and re-pairing of tie rod making and fabrication of pin and bush hole of Komatsu Dumper Sl.no. 10336 of Gidi-A Colliery.]
 [SO(X)(A)/e-NIT/01/26-27/01][2026_CCL_357892_1]
|
Central Coalfields Limited||Argada
|
| 7. |
01-Apr-2026 06:00 PM |
11-Apr-2026 04:00 PM |
13-Apr-2026 11:00 AM |
[Supplying of Top soil at the plantation site i.e. external OB Dump, Konar Exp under AKK OCP of BnK Area]
 [PE(C)/AKKOCP/E -Tender/PAPs/25-26/17][2026_CCL_357872_1]
|
Central Coalfields Limited||B&K
|
| 8. |
01-Apr-2026 06:00 PM |
13-Apr-2026 06:00 PM |
15-Apr-2026 11:00 AM |
[Making shed and platform for pump, transformer and switches at various locations in mine at Rajhara OCP under Rajhara Area.]
 [SO(C)/RA/e-tender/01/26-27/02 dt-01.04.2026][2026_CCL_357887_1]
|
Central Coalfields Limited||Rajhara
|
| 9. |
01-Apr-2026 06:00 PM |
13-Apr-2026 03:00 PM |
14-Apr-2026 10:15 AM |
[Cleaning of old garland drain, settling pond and kurse Nallah for monsoon preparation work under Bhurkunda project, Barka-Sayal area]
 [GM(BS)/Civil/Tender/26-27/04][2026_CCL_357888_1]
|
Central Coalfields Limited||Barka Syal
|
| 10. |
01-Apr-2026 06:00 PM |
13-Apr-2026 03:00 PM |
14-Apr-2026 10:00 AM |
[Cleaning of existing garland drains, cleaning of sedimentation pond, cutting new garland drains, provision of concrete pipe culverts and pump foundation under monsoon preparation works of Urimari Project, BarkaSayal Area.]
 [GM(BS)/Civil/Tender/26-27/02][2026_CCL_357886_1]
|
Central Coalfields Limited||Barka Syal
|
| 11. |
01-Apr-2026 05:00 PM |
10-Apr-2026 05:00 PM |
11-Apr-2026 11:00 AM |
[Dismantling, repairing and back fitment of 02 nos rear suspension assy, seal replace-ment, bush fitment and pin fabrication, stair, mud flap guard, safety walk, stopper frame, engine-transmission guard, anchor, etc of BH60M dumper T70 at AOCP]
 [PE(X)/AOCP/NIT/26-27/01][2026_CCL_357877_1]
|
Central Coalfields Limited||Piparwar
|
| 12. |
01-Apr-2026 03:00 PM |
11-Apr-2026 03:00 PM |
13-Apr-2026 10:00 AM |
[Repairing, Maintenance with spare of 2000 GPM 150Mtr head 2nd stage flow more make centrifogal pump Sl.No. - 17042951 and 1000 GPM pump ,150 Mtr head MLA type 4CHR Kirlosker make Sl. No. -1268799001 at Perej East Open Cast Project ,Hazaribag Area]
 [PO/PECP/EnM/Tender/MP/26-27/03][2026_CCL_357880_1]
|
Central Coalfields Limited||Hazaribag
|
| 13. |
01-Apr-2026 02:00 PM |
11-Apr-2026 02:00 PM |
13-Apr-2026 02:00 PM |
[Making 04 nos. of portable Shed for Motor-Pump of main sump and eastern sump at JOCP under Hazaribagh Area.]
 [PO/JOCP/EnM/Tender/26-27/03][2026_CCL_357879_1]
|
Central Coalfields Limited||Hazaribag
|
| 14. |
01-Apr-2026 02:00 PM |
17-Apr-2026 10:00 AM |
18-Apr-2026 11:30 AM |
[Providing and Laying of hume pipes under Magadh OCP of Magadh-Sanghmitra Area]
 [GMMS/SOC/Tender/25-26/77/1117][2026_CCL_357854_1]
|
Central Coalfields Limited||Magadh and Amrapali
|
| 15. |
01-Apr-2026 02:00 PM |
13-Apr-2026 03:00 PM |
14-Apr-2026 10:00 AM |
[Supply and Installation of Heat Shrinkable Jointing Kits on an as and when required basis for a period of one year at Birsa Project.]
 [PE(EnM)/BIRSA/ETENDER/25-26/38][2026_CCL_357878_1]
|
Central Coalfields Limited||Barka Syal
|
| 16. |
01-Apr-2026 02:00 PM |
11-Apr-2026 02:00 PM |
13-Apr-2026 02:00 PM |
[A) fabrication and commissioning of one (01) PVC drum pontoon for a 1000 GPM pump, along with B) repair of one (01) existing 72-drum pontoon used for a 2000 GPM pump, for deployment in the quarry sump to ensure efficient dewatering during the upcomin]
 [PO/JOCP/EnM/Tender/26-27/01][2026_CCL_357873_1]
|
Central Coalfields Limited||Hazaribag
|
| 17. |
01-Apr-2026 02:00 PM |
11-Apr-2026 02:00 PM |
13-Apr-2026 02:00 PM |
[1) Partial repairing and reconditioning 2000 GPM, single stage, spilt case, 250mm x 200mm size, UP-200/56 type pump assembly, Sl.no.-1748918012 pump in respect of JOCP 2) Modification/fabrication of base frame of one no. 1000 GPM pump installed at m]
 [PO/JOCP/EnM/Tender/26-27/02 ][2026_CCL_357875_1]
|
Central Coalfields Limited||Hazaribag
|
| 18. |
01-Apr-2026 02:00 PM |
11-Apr-2026 02:00 PM |
13-Apr-2026 02:00 PM |
[Tree trimming including cutting of branches and uprooting vines for a distance of 1Km/Day near 11KV/3.3KV/440V/220V incoming/outgoing OH Power Line at colony mines and bush cutting, surface dressing, vegetation removal in the all the substations an]
 [PO/JOCP/EnM/Tender/26-27/04][2026_CCL_357884_1]
|
Central Coalfields Limited||Hazaribag
|
| 19. |
01-Apr-2026 02:00 PM |
17-Apr-2026 10:00 AM |
18-Apr-2026 11:30 AM |
[Cleaning of garland drains, roadside drains, hume pipes etc. within mine premises under Magadh OCP of Magadh-Sanghmitra Area]
 [GMMS/SOC/Tender/25-26/76/1116][2026_CCL_357852_1]
|
Central Coalfields Limited||Magadh and Amrapali
|
| 20. |
01-Apr-2026 12:00 PM |
14-Apr-2026 11:00 AM |
15-Apr-2026 11:00 AM |
[Fabrication and commissioning of 0ne (01) no PVC drum pontoon for one (01) no of pump capacity 1000 GPM to run in the quarry sump for quick dewatering in the upcoming monsoon 2026 at Tapin OCP under Hazaribagh Area.]
 [PE(EnM)/TNOCP/Tender/26-27/02][2026_CCL_357870_1]
|
Central Coalfields Limited||Hazaribag
|