Logo
Notices eProcurement System of Coal India Limited
 
 
The latest Tender documents issued by various Government Departments, Directorates, Organisations, Institutions and local bodies of Coal India Limited-CIL are listed here.
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [ Replacement / Repairing of 03 No Plates and Testing of Rajapur OCP Weighbridge with 15 Tonne Test Weights.]
 [ BCCL/BA-IX/ENM/25-26/233 10/01/26][2026_BCCL_351006_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
2. 10-Jan-2026 06:00 PM 22-Jan-2026 10:00 AM 23-Jan-2026 11:00 AM [(A) Complete Rewinding/ Repairing of One(01) No.250 KVA 3.3KV/440 Volt Lighting Transformer GEC Make Sl.No.SQ 61/1116 and Local Id.No. NT/250 KVA/TR/09(B)TransformerLocal Id.No KJ/TR/250 KVA/05 of Kujama colliery ]
 [BCCL/LA/EnM/F-19/25-26/137][2026_BCCL_350976_1]
Bharat Coking Coal Limited||BCCL_LODNA AREA
3. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [Complete Repairing of SD 15 OCB Switch 200 A, 500/550V Make Killburn Sl. No 14008 Controlling to 120 HP Motor Pump Installed at 3 Seam ROCP/SJ]
 [BCCL/BA-IX/ENM/25-26/230 10/01/26][2026_BCCL_350998_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
4. 10-Jan-2026 06:00 PM 22-Jan-2026 10:00 AM 23-Jan-2026 11:00 AM [(A)Complete Repairing and Overhauling of One(01) No.HT Switch 11 KV 400Amps Andruyule Make VCB Switch Sl. No.2925 Local Id. JOY-03/SW/01 for Controlling Main Switch at 3 Pit and (B) Complete Repairing and Overhauling of One(01) No.HT Switch 11 KV 4]
 [BCCL/LA/EnM/F-19/25-26/135][2026_BCCL_350956_1]
Bharat Coking Coal Limited||BCCL_LODNA AREA
5. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [Re-Stamping of 01 No Weighbridge i.e Rajapur OCP and Shifting of 02 Times Additionally required 5 Tonne Test Weights i.e 5 Tonne Test Weights from Bastacolla OCP to Rajapur OCP and 5 Tonne Test Weights from Rajapur OCP Back to Bastacolla OCP respecti]
 [ BCCL/BA-IX/ENM/25-26/229 10/01/26][2026_BCCL_350996_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
6. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [Complete Repairing of MANDP Make PV-II 4 Stage Pump of Victory Filter Plant at Victory Colliery]
 [BCCL/BA-IX/ENM/25-26/228 10/01/26][2026_BCCL_350995_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
7. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [Repairing of Automatic Auto Transformer Starter 160HP 550V Control Panel Sl. No.- 4214 of Simlabahal Colliery 4 Pit Bastacolla Area]
 [BCCL/BA-IX/ENM/25-26/227 10/01/26][2026_BCCL_350993_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
8. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [Complete Repairing of 11KV OCB Switch 400A Make Biecco Lowrie Power Feeding to 500KVA Power Transformer at Khas Jharia]
 [ BCCL/BA-IX/ENM/25-26/232 10/01/26][2026_BCCL_351003_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
9. 10-Jan-2026 06:00 PM 22-Jan-2026 10:00 AM 23-Jan-2026 11:00 AM [(A) Complete Repairing and Overhauling of 1250Amps ECE Make 440Volt OCB Switch with busbar Id.No.ST/SW/VCB/440V /25 (B)A.C.B. Switch Sl. No. 403 Local ID. No. NT/ST/SW/ACB/440V/58 and(C)Sl.No.4TT1027 ID.No. BCCL/NT/SW/14 ]
 [BCCL/LA/EnM/F-19/25-26/138][2026_BCCL_350979_1]
Bharat Coking Coal Limited||BCCL_LODNA AREA
10. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [Complete Repairing of Automatic Auto Transformer Starter 160HP 550V Control Panel for Simlabahal 4 Pit]
 [BCCL/BA-IX/ENM/25-26/234 10/01/26][2026_BCCL_351008_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
11. 10-Jan-2026 06:00 PM 22-Jan-2026 10:00 AM 23-Jan-2026 11:00 AM [A)Complete Repairing and Overhauling of Safety Production of 1 No. H.T.Switch 11 KV 400Amps Crompton Greaves Make OCB Switch Sl.No.412256 (B)Submersible Auto Starter Sl. No.AS/241/2010-2011 ID No. JL/STR/05 ]
 [BCCL/LA/EnM/F-19/25-26/136][2026_BCCL_350975_1]
Bharat Coking Coal Limited||BCCL_LODNA AREA
12. 10-Jan-2026 06:00 PM 23-Jan-2026 09:00 AM 24-Jan-2026 10:00 AM [ Replacement / Repairing of 04 No Plates 6 FEET X5 FEET X16 mm and Testing of Kuya OCP Weighbridge with 15 Tonne Test Weights]
 [ BCCL/BA-IX/ENM/25-26/231 10/01/26][2026_BCCL_351000_1]
Bharat Coking Coal Limited||BCCL_BASTACOLLA AREA||EnM
13. 10-Jan-2026 05:00 PM 20-Jan-2026 06:00 PM 21-Jan-2026 09:00 AM [Structural Repair and Re-strengthening of Travelling Tripper Trolley-Unit 403-A including Discharge chute and Supporting Framework at Moonidih Coal Washery.]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1432][2026_BCCL_351038_1]
Bharat Coking Coal Limited||Areas of BCCL
14. 10-Jan-2026 05:00 PM 20-Jan-2026 06:00 PM 21-Jan-2026 09:00 AM [Repairing and Strengthening of all pump and motor base frame structure along with changing of damaged suction and delivery pipelines near the pumps under Thickener no.II of Moonidih coal Washery.]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1433][2026_BCCL_351041_1]
Bharat Coking Coal Limited||Areas of BCCL
15. 10-Jan-2026 04:00 PM 20-Jan-2026 06:00 PM 21-Jan-2026 09:00 AM [Mechanical Repairs, Structural Stringthening and Precision Re-alignment of Unit 203-B Rotary Breaker at ROM Section of Moonidih coal Washery]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1431][2026_BCCL_351036_1]
Bharat Coking Coal Limited||Areas of BCCL
16. 10-Jan-2026 04:00 PM 20-Jan-2026 06:00 PM 21-Jan-2026 09:00 AM [Repairing/ Overhauling of Heavy Duty Hexa cutter assembly at workshop of Moonidih Coal Washery]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1430 ][2026_BCCL_351033_1]
Bharat Coking Coal Limited||Areas of BCCL
17. 10-Jan-2026 03:30 PM 20-Jan-2026 06:00 PM 21-Jan-2026 09:00 AM [Repairing of 08 Nos. housings of WP-1 screen Vibrating Gear Box Assemblies at Moonidih Coal Washery]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1429 ][2026_BCCL_351032_1]
Bharat Coking Coal Limited||Areas of BCCL
18. 10-Jan-2026 03:00 PM 20-Jan-2026 05:00 PM 22-Jan-2026 10:00 AM [Repairing and maintenance of water supply pipe line of A type Qtr No. 01 to 192 at Nichitpur Township under Sijua Area.]
 [GM/SA/Civil/2025-26/eNIT-30][2026_BCCL_351029_1]
Bharat Coking Coal Limited||BCCL_SIJUA AREA
19. 10-Jan-2026 12:50 PM 21-Jan-2026 11:00 AM 22-Jan-2026 11:30 AM [Complete repairing and rewinding of 02 Nos. self starter 24V of delco remy 50MT 06 pole 02 nos for Dozer BD355 float of ADIC Kusunda Area]
 [BCCL/KA-VI/EXC/E-TEN/25-26/135][2026_BCCL_351022_1]
Bharat Coking Coal Limited||BCCL_KUSUNDA AREA
20. 10-Jan-2026 12:35 PM 21-Jan-2026 11:00 AM 22-Jan-2026 11:30 AM [Fabrication of ladder below bumper for all dumper and Water Tankers at ADIC Kusunda Area]
 [BCCL/KA-VI/EXC/E-TEN/25-26/134][2026_BCCL_351018_1]
Bharat Coking Coal Limited||BCCL_KUSUNDA AREA
Visitor No:6656433
Contents owned and maintained by Coal India Limited and its subsidiaries of Coal India Limited