| 1. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[(A) Dismantling of 10 Nos Pipe Pole and 3520 Mtrs O/H Conductor and Re-erection of 10 Nos. Pipe pole and 3520 Mtrs O/H Conductor 4 wire 440 Volt and 2 wire 220 Volt O/H (B) Dismantling of 550 Volt 3 wire O/H of length 4950 Mtrs (Approx) and 18 No. ]
 [BCCL/LA/EnM/F-19/25-26/222 ][2026_BCCL_356610_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 2. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[Re-construction of Earth Pits for 11 KV Sub-Station near 9 No. Railway Siding of Amal.NT-ST-JG Colliery under Lodna Area.]
 [BCCL/LA/EnM/F-19/25-26/220 ][2026_BCCL_356606_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 3. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 09:00 AM |
[Repairing and Strengthening of monorail and supporting structure at Secondary Crusher House at Moonidih Coal Washery.]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1795][2026_BCCL_356645_1]
|
Bharat Coking Coal Limited||Areas of BCCL
|
| 4. |
13-Mar-2026 06:55 PM |
24-Mar-2026 05:00 PM |
25-Mar-2026 11:00 AM |
[Towards repairing/replacement of damaged pipe line (Dia-6) used for domestic Pit water supply at Loyabad Colliery. (B) For the fabrication and modification of base plate, fabrication of 20 Taper bends, reducer, supply and modification of wood frame]
 [GM/SA/AM(EnM)-NIT/2025-26/227][2026_BCCL_356639_1]
|
Bharat Coking Coal Limited||BCCL_SIJUA AREA
|
| 5. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 09:00 AM |
[Repairing and Strengthening of monorail and its supporting structure at Primary Crusher House (Rotary Braker Section and Unit 105) at Moonidih Coal Washery.]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1794][2026_BCCL_356638_1]
|
Bharat Coking Coal Limited||Areas of BCCL
|
| 6. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 09:00 AM |
[Repair and Replacement of damaged pipelines around the Thickeners (02 Nos.) at Moonidih Coal Washery.]
 [BCCL/PO/MND/EnM/E -Tender/2025-26/E 1793][2026_BCCL_356630_1]
|
Bharat Coking Coal Limited||Areas of BCCL
|
| 7. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[Lifting of 2 Nos. existing break down submersible pumps with 6 inch dia damaged pipe (30 Nos.) both delivery and installation and commissioning of 2 Nos. submersible pump (1) Aqua machineries make 600 GPM 180 HP 550 V 180 Mtr. head 2900 RPM 3 S]
 [BCCL/LA/EnM/F-19/25-26/218 ][2026_BCCL_356597_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 8. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[Supply and Installation of Earth Pit at 06 No Siding Sector-2 Officers Colony of Amal.NT-ST-JG Colliery under Lodna Area.]
 [BCCL/LA/EnM/F-19/25-26/219 ][2026_BCCL_356601_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 9. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[(A)Indoor and outdoor 11 KV cable jointing at Paharigora S/S of Jeenagora Section and East Bararee S/S and (B ) Making 3.3 KV grade Straight through cable Jointing and outdoor cable of Amal.NT-ST-JG Colliery under Lodna Area. ]
 [BCCL/LA/EnM/F-19/25-26/216 ][2026_BCCL_356590_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 10. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[Erection of Two (02) new 3.3 KV O/H line Feeder from K.T.Jeenagora to the abandoned water sump at Jeenagora Mines covering an Approx. length of (6450 Mtrs/2541.300 Kgs) to maintain an uninterrupted water supply of Amal. NT-ST-JG Colliery under Lodna]
 [BCCL/LA/EnM/F-19/25-26/217 ][2026_BCCL_356593_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 11. |
13-Mar-2026 06:55 PM |
24-Mar-2026 05:00 PM |
25-Mar-2026 11:00 AM |
[For repairing of damaged pipeline 4 inch dia at Jogta Coal dump under Kankanee Colliery. (B). For diversion of a section of the 1000 GPM pump delivery range (6 inch dia M.S pipeline) of length 600m, which falls under the proposed OB dump area at ASB]
 [GM/SA/AM(EnM)-NIT/2025-26/228][2026_BCCL_356651_1]
|
Bharat Coking Coal Limited||BCCL_SIJUA AREA
|
| 12. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[Erection of Peripheral Lightening Line of Kujama Colliery along the Haulage and Travelling Road Near View Point Leading towards the mines and Coal/O.B. Dump Area of Amal. NT-ST-Kujama Colliery under Lodna Area.]
 [BCCL/LA/EnM/F-19/25-26/223 ][2026_BCCL_356615_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 13. |
13-Mar-2026 06:55 PM |
21-Mar-2026 06:00 PM |
23-Mar-2026 11:00 AM |
[Shifting (Erection as well as Dismantling) of 3 wire 3.3 KV O/H Line of Feeder-I and Feeder-II from 6 Pit Sub-Station Bararee to Pumping Site at Amal. Joyrampur Colliery under Lodna Area.]
 [BCCL/LA/EnM/F-19/25-26/221 ][2026_BCCL_356608_1]
|
Bharat Coking Coal Limited||BCCL_LODNA AREA
|
| 14. |
13-Mar-2026 06:30 PM |
21-Mar-2026 06:30 PM |
23-Mar-2026 09:00 AM |
[Digging Pits at different Coal heaps for ascertaining the height of coal stock during Annual Coal Stock Measurement 2025-26 and quarterly Coal Stock Measurement, QUARTER Ending June26 at Patherdih Coal Washery, Old PCW under EWZ Area]
 [BCCL/EWZ/NLWPCW/25-26/019][2026_BCCL_356643_1]
|
Bharat Coking Coal Limited||Areas of BCCL
|
| 15. |
13-Mar-2026 06:00 PM |
24-Mar-2026 05:00 PM |
25-Mar-2026 11:00 AM |
[Towards repairing of PCB 200A,550V LT Switch at 5 pit substn. LBC(ii)repairing/overhauling of LT Switch GEC make OCB 400A 550V/440V BOCP under Sijua Area]
 [GM/SA/AM(EnM)-NIT/2025-26/226][2026_BCCL_356631_1]
|
Bharat Coking Coal Limited||BCCL_SIJUA AREA
|
| 16. |
13-Mar-2026 06:00 PM |
23-Mar-2026 06:00 PM |
24-Mar-2026 11:00 AM |
[Repairing/overhauling of three (03) Nos. Agitators over flocculator tank at CPP, Moonidih, W.J.A.]
 [ BCCL/WJA/AM(ENM)/25-26/RP-217 ][2026_BCCL_356636_1]
|
Bharat Coking Coal Limited||BCCL_WJ AREA
|
| 17. |
13-Mar-2026 06:00 PM |
23-Mar-2026 06:00 PM |
24-Mar-2026 10:00 AM |
[Miscellaneous Civil work for ETP at Damoda workshop and Muraidih workshop under Barora Area]
 [GM/Ar-1/Civil/e-NIT/25-26/96 dt-13.03.2026][2026_BCCL_356617_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 18. |
13-Mar-2026 06:00 PM |
23-Mar-2026 06:00 PM |
24-Mar-2026 10:00 AM |
[COMPLETE REPAIRING AND OVERHAULING OF 11 KV 400A OCB SWITCH MAKE GEC SL NO 5646 ABD 2.2 KV 300 AMP OCB MAKE GEC SL NO-64888 AT SITE OF KENDUADIH SUBSTATION UNDER KENDUADIH COLLIERY.]
 [BCCL/PBA/AM(EnM)/2025-26/94 DATED-13.03.2026][2026_BCCL_356486_1]
|
Bharat Coking Coal Limited||BCCL_PB AREA
|
| 19. |
13-Mar-2026 06:00 PM |
23-Mar-2026 06:00 PM |
24-Mar-2026 10:00 AM |
[REWINDING AND CONVERSION FROM 550V TO 415V OF 60 HP, 3 PHASE INDUCTION MOTOR COLLIERY CODE - KC/MOTOR/02 AND REPAIRING OF 200 HP, 550V STAR DELTA STARTER MAKE KILBURN SL NO - F33434 OF KENDUADIH COLLIERY.]
 [BCCL/PBA/AM(EnM)/2025-26/93 DATED-13.03.2026][2026_BCCL_356485_1]
|
Bharat Coking Coal Limited||BCCL_PB AREA
|
| 20. |
13-Mar-2026 06:00 PM |
23-Mar-2026 06:00 PM |
24-Mar-2026 10:00 AM |
[COMPLETE REPAIRING AND OVERHAULING OF 11KV, 400A OCB, MAKE- BIECCO LAWRIE, S.NO.-11263 AND 3.3KV, 400A OCB, MAKE- BIECCO LAWRIE, S.NO.-4271 AT SITE OF POWER SUBSTATION OF KB 5/6 PIT COLLIERY, PB AREA.]
 [BCCL/PBA/AM(EnM)/2025-26/98 DATED-13.03.2026][2026_BCCL_356545_1]
|
Bharat Coking Coal Limited||BCCL_PB AREA
|