| 1. |
07-May-2026 06:55 PM |
18-May-2026 05:00 PM |
20-May-2026 11:00 AM |
[Maintenance of telephone line networking running from Koyla Bhawan MDF to various locations i.e. inside Koyla Bhawan Office, Koyla Nagar Colony, CMD Bungalow Saraidhella, and HRD Kalyan Bhawan for a period of two year.]
 [BCCL/KB/EnT and IT Initiative/26-27/01 Dt.-07.05.2026][2026_BCCL_359232_1]
|
Bharat Coking Coal Limited||BCCL-Hqrs||HQ_EnT
|
| 2. |
07-May-2026 06:55 PM |
13-May-2026 06:00 PM |
14-May-2026 10:00 AM |
[Work of Upgradation of Electrical Wiring at Koyla Bhawan Legal Deptt. Level I, CNB Deptt. Level 0, IAD Deptt. Level II , and ENM Deptt. Level IV as per scope of BOQ.]
 [BCCL/KB/ENM//OT/26-27/06][2026_BCCL_359233_1]
|
Bharat Coking Coal Limited||BCCL-Hqrs||HQ_EnM
|
| 3. |
07-May-2026 06:00 PM |
16-May-2026 06:00 PM |
18-May-2026 10:00 AM |
[RENOVATION AND MAINTAINENCE JOB OF EXISTING 11KV, 3.3KV OH LINE RUNNING FROM LAIKDIH 2MVA, LKD SUB-STATION AND TOWARDS WATER FILTER PLANT UNDER THE DAHIBARIBASANTIMATA COLLIERY.]
 [BCCL/CV/XII/EnM/ TENDER/2026-27/04][2026_BCCL_359228_1]
|
Bharat Coking Coal Limited||BCCL_CV AREA
|
| 4. |
07-May-2026 01:00 PM |
16-May-2026 01:00 PM |
18-May-2026 10:00 AM |
[DISMANTLING AND ERECTION OF POLE FOR LIGHTING LINE NEAR KALIMATTI MINES AND KALYANCHAK,DAHIBARI.]
 [BCCL/CV/XII/EnM/ TENDER/2026-27/02][2026_BCCL_359198_1]
|
Bharat Coking Coal Limited||BCCL_CV AREA
|
| 5. |
07-May-2026 01:00 PM |
16-May-2026 01:00 PM |
18-May-2026 10:00 AM |
[REPAIRING OF AB SWITCH AND POLE MOUNTING KIT AT VARIOUS PLACES UNDER DAMAGORIA COLLIERY.]
 [BCCL/CV/XII/EnM/ TENDER/2026-27/03][2026_BCCL_359206_1]
|
Bharat Coking Coal Limited||BCCL_CV AREA
|
| 6. |
07-May-2026 11:00 AM |
18-May-2026 05:00 PM |
19-May-2026 11:00 AM |
[CONSTRUCTION OF COMMUNITY SHED AT BARAKAR RIVER BANK UNDER C.V. AREA]
 [BCCL/XII/ACE/ e-Tender-5/2026-27/5 Date-06.05.2026][2026_BCCL_359142_1]
|
Bharat Coking Coal Limited||BCCL_CV AREA
|
| 7. |
07-May-2026 10:00 AM |
14-May-2026 05:00 PM |
16-May-2026 10:00 AM |
[Providing 35 nos. permanent survey station at ABG Colliery under Govindpur Area.]
 [Ref NoBCCL/GM/AR III/ASO/E-NIT/2026-27/1040 Date02052026 ][2026_BCCL_359081_1]
|
Bharat Coking Coal Limited||BCCL_GOVINDPUR AREA
|
| 8. |
07-May-2026 10:00 AM |
14-May-2026 05:00 PM |
16-May-2026 10:00 AM |
[Repairing of 06 nos. isolation stopping and providing water seal at II seam U/G of NAK Colliery under Govindpur Area.]
 [Ref NoBCCL/GM/AR III/ASO/E-NIT/2026-27/1041 Date02052026][2026_BCCL_359086_1]
|
Bharat Coking Coal Limited||BCCL_GOVINDPUR AREA
|
| 9. |
07-May-2026 10:00 AM |
16-May-2026 05:00 PM |
18-May-2026 10:00 AM |
[Felling of 1018 trees stacking of timber and firewood ]
 [BCCL/GM/AR III/ACE/E-NIT/26-27/ 15/565-590][2026_BCCL_359128_1]
|
Bharat Coking Coal Limited||BCCL_GOVINDPUR AREA
|
| 10. |
07-May-2026 10:00 AM |
16-May-2026 05:00 PM |
18-May-2026 10:00 AM |
[Distempering and painting of shiv Mandir at sinidih]
 [BCCL/GM/AR III/ACE/E-NIT/26-27/16/ 595-620][2026_BCCL_359189_1]
|
Bharat Coking Coal Limited||BCCL_GOVINDPUR AREA
|
| 11. |
07-May-2026 09:00 AM |
18-May-2026 06:00 PM |
19-May-2026 11:00 AM |
[Work of regarding monsoon related miscellaneous jobs for overhead line (HT N LT) maintenance including tree OR Bush trimming for Central Township, Koyla Nagar, Jagjiwan Nagar, Kusum Vihar and Karmik Nagar as per scope of BOQ]
 [BCCL/KB/ENM/PS/OT/26-27/04][2026_BCCL_358970_1]
|
Bharat Coking Coal Limited||BCCL-Hqrs||HQ_EnM
|
| 12. |
06-May-2026 06:40 PM |
18-May-2026 06:40 PM |
19-May-2026 10:00 AM |
[(A) Dismantling of 3.3KV O/H line due to advancement of Mines at 7A-Patch and (B) Diversion of 3.3KV O/H Line from 7-A Patch via Haul Road to Main Patch due to advancement of Mines at 7-A Patch at Phularitand AMP Colliery under Barora Area.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/017][2026_BCCL_359161_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 13. |
06-May-2026 06:35 PM |
18-May-2026 06:35 PM |
19-May-2026 10:00 AM |
[Shifting of 02Nos. of HT 2000GPM Pump Motor set in the lower/safe side of the sump No.-01 and sump No.-02 due to decreasing of water level at old ghutway patch-3 along with erection of its 8inch dia M.S. Pipe line at Damoda Colliery.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/016][2026_BCCL_359159_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 14. |
06-May-2026 06:30 PM |
18-May-2026 06:30 PM |
19-May-2026 10:00 AM |
[Shifting and installation of MN-6 pump motor set of Madhuban Incline in upper and safe side of the Incline 04times due to continuously water level increasing at Phularitand, AMP Colliery, Barora Area.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/010][2026_BCCL_359141_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 15. |
06-May-2026 06:30 PM |
18-May-2026 06:30 PM |
19-May-2026 10:00 AM |
[Casting and machining of two 14inch, two 12inch dia and four 8inch dia C I coupling for pump of Muaridih AMP Colliery.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/009][2026_BCCL_359138_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 16. |
06-May-2026 06:30 PM |
18-May-2026 06:30 PM |
19-May-2026 10:00 AM |
[Transporting of 150nos. 8inch dia MS pipes from Muraidih W/S to SOCP attendance room premises and fabrication of 300nos. flange along with fabrication of 8inch dia MS bend, MS taper pipe and MS short piece for erection of pipe line under AMPC.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/008][2026_BCCL_359136_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 17. |
06-May-2026 06:30 PM |
18-May-2026 06:30 PM |
19-May-2026 10:00 AM |
[Diff.types of pumping and pipeline work i.e.replacing B/D 6.6 kV motor of Jharna face sump,replacing turbine pump with 2000GPM pump in river side sump,extension of suction pipe,bearing changing,maint. of domestic pipeline and other misc. jobs,AMPC.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/007][2026_BCCL_359135_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 18. |
06-May-2026 06:30 PM |
18-May-2026 06:30 PM |
19-May-2026 10:00 AM |
[(A) Installation of 4000GPM pump set in main patch sump and erection of its delivery from main patch to SILO Nalla (B) Shifting of both drum pontoon along with their pump motor set to the lower side of the sump due to decrease of water level, AMPC.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/006][2026_BCCL_359133_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 19. |
06-May-2026 06:30 PM |
18-May-2026 06:30 PM |
19-May-2026 10:00 AM |
[Shifting of 3000GPM pump motor set from feeder breaker to main patch water sump and erection of its Pipe line at Phularitand under AMP Colliery, Barora Area.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/005][2026_BCCL_359131_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
| 20. |
06-May-2026 06:30 PM |
18-May-2026 06:30 PM |
19-May-2026 10:00 AM |
[Maintenance of 11nos. chemical earthpit through repairing, overhauling and filling required chemical materials in weighbridge and repairing of weighbridge light at Damoda Colliery.]
 [BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/015][2026_BCCL_359155_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|