Logo
Notices eProcurement System of Coal India Limited
 
 
 
  Tenders/Auctions Closing Today
 
 
 Search By     
 
 
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 09-Apr-2024 04:00 PM 19-Apr-2024 04:00 PM 20-Apr-2024 04:00 PM [Construction of 12 Nos Isolation Stopping to isolate the Panel PB1 and PB2 at RVIIB seam of CM Project under Nakrakonda Kumardihi B Colliery] [ECL/GM/BA/E TENDER/24-25/Min/01 Dt 09.04.2024][2024_ECL_306413_1] Eastern Coalfields Limited||ECL_Bankola area
2. 09-Apr-2024 06:00 PM 19-Apr-2024 04:00 PM 20-Apr-2024 12:00 PM [Providing gabion structure inside mine slop to avoid rain cut and flow of OB into mine for slope stability and reduce siltation at Ukni deep OCM of Ukni-Junad Sub Area of Wani North Area. Note Max labour required 574 no for this work.] [wn4650-civ-e001-2024-25 dt.09.04.2024][2024_WCL_306409_1] Western Coalfields Limited||Wani N||Wani N_Civil
3. 09-Apr-2024 06:00 PM 19-Apr-2024 04:00 PM 20-Apr-2024 12:00 PM [Cleaning of septic tank inspection chamber sewerline and cleaning of all size drain collection and removal carries disposal of garbage including brooming of colony roads at Rajur under Ghonsa Sub Area. Note Approx maximum number of labour required] [wn4650-civ-e001-2024-25 dt.09.04.2024][2024_WCL_306409_2] Western Coalfields Limited||Wani N||Wani N_Civil
4. 09-Apr-2024 06:00 PM 19-Apr-2024 04:00 PM 20-Apr-2024 12:00 PM [Excavation of drains, desilting and cleaning of existing drains during monsoon-2024 at Ghonsa OC Mine of Ghonsa Sub Area. Note Approx maximum number of labour required 153 for the work.] [wn4650-civ-e001-2024-25 dt.09.04.2024][2024_WCL_306409_3] Western Coalfields Limited||Wani N||Wani N_Civil
5. 09-Apr-2024 06:00 PM 19-Apr-2024 04:00 PM 20-Apr-2024 12:00 PM [Repairing of existing culvert retaing wall near cremation shed on Rajur-Bhandewada incline approach road at Ghonsa Sub Area Note Approx maximum number for the work is 244 labour required ] [wn4650-civ-e001-2024-25 dt.09.04.2024][2024_WCL_306409_4] Western Coalfields Limited||Wani N||Wani N_Civil
6. 02-Apr-2024 06:55 PM 19-Apr-2024 05:00 PM 22-Apr-2024 11:00 AM [MAKING OF EARTHEN EMBANKMENT ALONG BRAJSAGAR NALLAH AND NORTH EAST SIDE OF Z PATCH FOR LENGTH OF 270 MTR AT KOCP, KA (RE TENDER)] [MCL/GM(KA)/SO(C)/2024-25/12 DT. 02/04/24][2024_MCL_306218_1] Mahanadi Coalfields Limited||KANIHA AREA||KANIHA_CIVIL||CIVIL
7. 02-Apr-2024 06:55 PM 19-Apr-2024 05:00 PM 22-Apr-2024 11:00 AM [MAKING OF 2 NOS. OF GROUND WATER MONITORING STATION AT KANIHA OCP,KA] [MCL/GM(KA)/SO(C)/2024-25/18 DT. 02/04/24][2024_MCL_306226_1] Mahanadi Coalfields Limited||KANIHA AREA||KANIHA_CIVIL||CIVIL
8. 09-Apr-2024 11:00 AM 19-Apr-2024 05:00 PM 20-Apr-2024 05:00 PM [Erection of LT and Lighting line along with providing and fixing of street light bracket from Dozer section square to east receiving point of L and T CHP , Dudhichua Project] [DCH/EnM/Tender/33KV/24-25/006][2024_NCL_306356_1] Northern Coalfields Limited||Dudichua Project
9. 09-Apr-2024 11:00 AM 19-Apr-2024 05:00 PM 20-Apr-2024 05:00 PM [Making of Suction, delivery of MS pipe with flange and stairs for approaching to pontoon at Dudhichua Project ] [DCH/EnM/Tender/FLD/24-25/008 ][2024_NCL_306378_1] Northern Coalfields Limited||Dudichua Project
10. 09-Apr-2024 10:00 AM 19-Apr-2024 05:00 PM 20-Apr-2024 10:00 AM [Comprehensive maintenance contract of air conditioning units installed at IICM, Ranchi for a Period of eight months(240 days)] [IICM/Serv/etender/24-25/13 dt. 08.04.2024][2024_IICM_306387_1] Indian Institute Of Coal Management||E and M
Visitor No:6656433
Contents owned and maintained by Coal India Limited and its subsidiaries of Coal India Limited