1. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Loading, shifting, installation with repair and maintenance of one old switchgear of type OCB of voltage grade 3.3KV]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_1]
|
Central Coalfields Limited||B&K
|
2. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Repair maintenance, replacement , erection of damaged pole and conductor ect in different colonies ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_2]
|
Central Coalfields Limited||B&K
|
3. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Repair and re-arrangement of Interlocking System in HT GOAB Switch connected with respective switchgear of different place ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_3]
|
Central Coalfields Limited||B&K
|
4. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Fencing of 630 KVA transformer ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_4]
|
Central Coalfields Limited||B&K
|
5. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Bush cutting trimming, trimming of tree and uprooted vegetation ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_5]
|
Central Coalfields Limited||B&K
|
6. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Repair and preventive maintenance of the Horn gap fuse system ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_6]
|
Central Coalfields Limited||B&K
|
7. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Repairing and maintenance of440V, 4wire system overhead line accessories , and cradling ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_7]
|
Central Coalfields Limited||B&K
|
8. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Installation cum Provision of monitoring panel at 12 site for voltage and Ampere in secondary side of distribution transformer ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_8]
|
Central Coalfields Limited||B&K
|
9. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Maintenance of 440 volt OH line with Stringing of conductor, cradling arrangement, extension]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_10]
|
Central Coalfields Limited||B&K
|
10. |
08-Sep-2025 12:00 PM |
18-Sep-2025 01:00 PM |
19-Sep-2025 01:00 PM |
[Onsite preventive maintenance of 17 nos transformers including cleaning of sludge, transformer oil filtration and painting joint ]
[PE(EnM)/KGOCP/Tender/25-26/06 ][2025_CCL_343465_9]
|
Central Coalfields Limited||B&K
|