1. |
10-Jul-2025 06:00 PM |
19-Jul-2025 09:00 AM |
21-Jul-2025 10:00 AM |
[Repairing of front main frame of IDM-30 Drill, RDC-1321 of Kathara Colliery.]
[PO/PE(Ex)/KTC/E-Tend/25-26/148 dt.10.07.25][2025_CCL_339320_1]
|
Central Coalfields Limited||Kathara
|
2. |
10-Jul-2025 06:00 PM |
19-Jul-2025 09:00 AM |
21-Jul-2025 10:00 AM |
[Repairing of damaged and worn-out boom foot eye and boom mounting eye both side turret structure by welding and line boring of ZX-650 Tata Hitachi backhoe Sl. No. DACG-0164, at Kathara Colliery.]
[PO/PE(Ex)/KTC/E-Tend/25-26/144 dt.10.07.25][2025_CCL_339314_1]
|
Central Coalfields Limited||Kathara
|
3. |
10-Jul-2025 06:00 PM |
19-Jul-2025 09:00 AM |
21-Jul-2025 10:00 AM |
[Repairing of central journal of EKG-5A Exc-2859 Shovel of Kathara Colliery.]
[PO/PE(Ex)/KTC/E-Tend/25-26/149 dt.10.07.25][2025_CCL_339321_1]
|
Central Coalfields Limited||Kathara
|
4. |
10-Jul-2025 06:00 PM |
19-Jul-2025 09:00 AM |
21-Jul-2025 10:00 AM |
[Repairing of middle hoist rope pulley of bell bar and its foundation oval eye hole line boring of 182 M, Marion Shovel Exc-1851 Shovel of Kathara Colliery.]
[PO/PE(Ex)/KTC/E-Tend/25-26/145 dt.10.07.25][2025_CCL_339315_1]
|
Central Coalfields Limited||Kathara
|
5. |
10-Jul-2025 06:00 PM |
19-Jul-2025 09:00 AM |
21-Jul-2025 10:00 AM |
[Repairing, dismantling and fitting hoist 1st intermediate shaft assembly of BE-195, Sl. No. 1075 Shovel of Kathara Colliery.]
[PO/PE(Ex)/KTC/E-Tend/25-26/146 dt.10.07.25][2025_CCL_339318_1]
|
Central Coalfields Limited||Kathara
|
6. |
10-Jul-2025 06:00 PM |
19-Jul-2025 09:00 AM |
21-Jul-2025 10:00 AM |
[Repairing of hydraulic tank assembly and body movement both oval eye line boring of BH-100 T Dumper Sl. No. D-90105 of Kathara Colliery.]
[PO/PE(Ex)/KTC/E-Tend/25-26/151 dt.10.07.25][2025_CCL_339324_1]
|
Central Coalfields Limited||Kathara
|
7. |
09-Jul-2025 09:00 AM |
19-Jul-2025 09:00 AM |
21-Jul-2025 09:00 AM |
[Providing, fitting of coupling, coupling bolts and installation of protective device for emergency stop operation for smooth operation of HT pumps at mines of AKKOCP, BnK Area]
[PE(EnM)/AKK OCP/e-tender/25-26/22][2025_CCL_339172_1]
|
Central Coalfields Limited||B&K
|
8. |
09-Jul-2025 09:00 AM |
19-Jul-2025 09:00 AM |
21-Jul-2025 09:00 AM |
[Re plastering of 20Nos old isolation stopping at 5 and 6 pit of Madhaipur Colliery (Panel no-5pit SLW 6 Nos, 19-20 in between/ 28L-38L 8 Nos and 22-23 in between 48L-53L 6 Nos Total 20 Nos stopping), Pandaveswar Area]
[GM/PND/Sur/Ten/25-26/09/50 Dt. 07-07-2025][2025_ECL_339174_1]
|
Eastern Coalfields Limited||ECL_Pandaveswar area
|
9. |
09-Jul-2025 09:00 AM |
19-Jul-2025 09:00 AM |
21-Jul-2025 09:00 AM |
[Drilling of Seven (07) numbers NX size coring Borehole (20m each), from R-IV TOP to R-IV bottom seam of Khottadih Colliery, Pandaveswar Area]
[GM/PND/Sur/Ten/25-26/10/51 Dt. 07-07-2025][2025_ECL_339176_1]
|
Eastern Coalfields Limited||ECL_Pandaveswar area
|
10. |
09-Jul-2025 09:00 AM |
19-Jul-2025 09:00 AM |
21-Jul-2025 09:00 AM |
[Repairing of shed for STP at Shankarpur 3/4 pit near RO plant of Bankola Area.]
[ ECL/GM/BA/E TENDER/25-26/Env/07 Dt 09.07.2025][2025_ECL_339177_1]
|
Eastern Coalfields Limited||ECL_Bankola area
|