1. |
09-Apr-2024 06:00 PM |
20-Apr-2024 03:00 PM |
22-Apr-2024 11:00 AM |
[Supplying and distribution of domestic water for Colonies of Saunda-D, Central Saunda, CCL Saunda, Datto and Nakari through one number water tanker as and when required through Saunda-D Project, Barka-Sayal Area.]
[GM(BS)/Civil/Tender/24-25/06][2024_CCL_306419_1]
|
Central Coalfields Limited||Barka Syal
|
2. |
10-Apr-2024 01:00 PM |
20-Apr-2024 03:30 PM |
22-Apr-2024 04:00 PM |
[Cleaning of existing kutcha drains at various places before and during monsoon at Sasti Expansion OCM under Sasti Sub Area ]
[wcl-ba3650-civ-e09-24-25/16][2024_WCL_306424_1]
|
Western Coalfields Limited||BLP||BLP_Civil
|
3. |
10-Apr-2024 09:00 AM |
20-Apr-2024 04:00 PM |
22-Apr-2024 10:00 AM |
[Providing and fitment of float glass , plastic glass , toughened glass , door lock , rear view mirror etc in different HEMMs working at Krishnashila Project on as and when required basis. ]
[KSL/SO (Excv.)/E_Tender/24-25/03 dtd- 09.04.2024][2024_NCL_306391_1]
|
Northern Coalfields Limited||Krishnashila Project
|
4. |
04-Apr-2024 04:00 PM |
20-Apr-2024 04:00 PM |
22-Apr-2024 11:00 AM |
[Construction of RCC storm water drain in place of existing damaged rubble masonary drain at CMPDI complex Jaripatka Nagpur. (Phase II)]
[CMPDI/RIN/CE-455(N)/2024/01][2024_CMPDI_306217_1]
|
Central Mine Planning and Design Institute Limited||Regional Institute - IV||RR-IV-Civil Department
|
5. |
13-Apr-2024 04:00 PM |
20-Apr-2024 04:00 PM |
22-Apr-2024 11:00 AM |
[Repairing of Transformers]
[wcl-pe3350-enm-52-2023-24][2024_WCL_306575_1]
|
Western Coalfields Limited||Pench||Pench_E and M
|
6. |
10-Apr-2024 09:00 AM |
20-Apr-2024 04:00 PM |
22-Apr-2024 10:00 AM |
[Offloading the work of cutting of damage pin and bush of front link ( articulating joint ) , co axial boring of inner pin housing , front chassis link and arm blade assembly in CAT 834K Wheel Dozer of Krishnashila Project.]
[KSL/SO (Excv.)/E_Tender/24-25/02 DTD- 09.04.2024][2024_NCL_306390_1]
|
Northern Coalfields Limited||Krishnashila Project
|
7. |
09-Apr-2024 01:00 PM |
20-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[REPAIRING OF 02 NOS. OF BAREJA MAKE CENTRIFUGAL PUMPS MODEL NO. 123 C4 INSTALLED AT RAJNAGAR RO UG MINE]
[AGM/HSD/SO(ENM)/E-Tender/05 DT 09.04.2024][2024_SECL_306405_1]
|
South Eastern Coalfields Limited||Hasdeo Area
|
8. |
09-Apr-2024 06:55 PM |
20-Apr-2024 05:00 PM |
22-Apr-2024 10:00 AM |
[Renovation of Magazine building located at Jambubahali complex of BBSRI OCP under Jagannath Area (Re-tender/2nd call).]
[MCL/GM(JA)/SO(C)/e- Tender/24-25/04 Dtd-09/04/24][2024_MCL_306404_1]
|
Mahanadi Coalfields Limited||JAGANNATH AREA||JAGN_CIVIL||CIVIL
|
9. |
07-Mar-2024 11:00 AM |
20-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Design, Engg., Construction, Fabrication, Erection, Supply, Installation, Testing and Commissioning of grid connected SPP of capacity of 13 MW (AC) with min. 35 percentage DC overload, at NK Area, CCL with 5 yrs comprehensive OnM.]
[CMPDI/ENM/CCL/SOLAR/2024/01][2024_CMPDI_303970_1]
|
Central Mine Planning and Design Institute Limited||Corporate Head Quarters||CHQ-E and M Department
|
10. |
29-Mar-2024 10:00 AM |
20-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Repairing of coal transportation road from NH Bilaspur road to Amera at Amera OCP under Amera Sub Area of Bishrampur Area.]
[GM/BSPR/Civil/e-tender/ 2023-24/62 Dt.27.03.2024][2024_SECL_305894_1]
|
South Eastern Coalfields Limited||Bishrampur Area
|