1. |
09-Apr-2024 06:00 PM |
20-Apr-2024 03:00 PM |
22-Apr-2024 11:00 AM |
[Supplying and distribution of domestic water for Colonies of Saunda-D, Central Saunda, CCL Saunda, Datto and Nakari through one number water tanker as and when required through Saunda-D Project, Barka-Sayal Area.]
[GM(BS)/Civil/Tender/24-25/06][2024_CCL_306419_1]
|
Central Coalfields Limited||Barka Syal
|
2. |
10-Apr-2024 01:00 PM |
20-Apr-2024 03:30 PM |
22-Apr-2024 04:00 PM |
[Cleaning of existing kutcha drains at various places before and during monsoon at Sasti Expansion OCM under Sasti Sub Area ]
[wcl-ba3650-civ-e09-24-25/16][2024_WCL_306424_1]
|
Western Coalfields Limited||BLP||BLP_Civil
|
3. |
04-Apr-2024 04:00 PM |
20-Apr-2024 04:00 PM |
22-Apr-2024 11:00 AM |
[Construction of RCC storm water drain in place of existing damaged rubble masonary drain at CMPDI complex Jaripatka Nagpur. (Phase II)]
[CMPDI/RIN/CE-455(N)/2024/01][2024_CMPDI_306217_1]
|
Central Mine Planning and Design Institute Limited||Regional Institute - IV||RR-IV-Civil Department
|
4. |
13-Apr-2024 04:00 PM |
20-Apr-2024 04:00 PM |
22-Apr-2024 11:00 AM |
[Repairing of Transformers]
[wcl-pe3350-enm-52-2023-24][2024_WCL_306575_1]
|
Western Coalfields Limited||Pench||Pench_E and M
|
5. |
10-Apr-2024 09:00 AM |
20-Apr-2024 04:00 PM |
22-Apr-2024 10:00 AM |
[Offloading the work of cutting of damage pin and bush of front link ( articulating joint ) , co axial boring of inner pin housing , front chassis link and arm blade assembly in CAT 834K Wheel Dozer of Krishnashila Project.]
[KSL/SO (Excv.)/E_Tender/24-25/02 DTD- 09.04.2024][2024_NCL_306390_1]
|
Northern Coalfields Limited||Krishnashila Project
|
6. |
10-Apr-2024 09:00 AM |
20-Apr-2024 04:00 PM |
22-Apr-2024 10:00 AM |
[Providing and fitment of float glass , plastic glass , toughened glass , door lock , rear view mirror etc in different HEMMs working at Krishnashila Project on as and when required basis. ]
[KSL/SO (Excv.)/E_Tender/24-25/03 dtd- 09.04.2024][2024_NCL_306391_1]
|
Northern Coalfields Limited||Krishnashila Project
|
7. |
05-Apr-2024 02:00 PM |
20-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Construction of DG rooms including providing, installation and Maintenance of DG sets for drinking water supply at Koyla Nagar Township under CED HQ]
[BCCL/CED/TC/eNIT-82/23-24/1355 dated 29.03.2024][2024_BCCL_306293_1]
|
Bharat Coking Coal Limited||BCCL-Hqrs||HQ_CIVIL
|
8. |
05-Apr-2024 10:00 AM |
20-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Erection of 3.3 KV HT line at Patch B and Patch A extension patch of Bijari OCM ]
[SECL/GM/RGH/EnM/e-Tender /24-25/01 Dt 04.04.2024][2024_SECL_306273_1]
|
South Eastern Coalfields Limited||Raigarh Area
|
9. |
09-Apr-2024 05:00 PM |
20-Apr-2024 05:00 PM |
22-Apr-2024 10:00 AM |
[Sanitation work at residential areas of Tikak Colliery]
[NEC/CIL/MRG/ET/379][2024_NEC_306406_1]
|
North Eastern Coalfields, Margherita||NEC_CIVIL
|
10. |
09-Apr-2024 06:55 PM |
20-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Power arrangement for installation of Biometric attendance machine in various places of Amrapali OCP and GM Unit under A-C Area]
[GM(A-C)/SO(EnM)/e-NIT/24-25/03][2024_CCL_306426_1]
|
Central Coalfields Limited||Magadh and Amrapali
|