1. |
02-Sep-2025 02:00 PM |
16-Sep-2025 02:00 PM |
16-Sep-2025 03:00 PM |
[REQUEST FOR EXPRESSION OF INTEREST FOR COMPLETE EPC PACKAGE (INCL. LAND AND CONNECTIVITY) OF ISTS-CONNECTED WIND ENERGY PROJECTS WITH NOMINAL CAPACITY OF 2000 MW ANYWHERE IN INDIA ]
[EOI/Wind/2000 MW dated 01.09.2025][2025_CILHQ_343039_1]
|
Coal India Limited||Coal India Limited,HQ,Kolkata||CIL-HQ_Solar (EED)
|
2. |
02-Sep-2025 02:00 PM |
16-Sep-2025 02:00 PM |
16-Sep-2025 03:00 PM |
[REQUEST FOR EXPRESSION OF INTEREST FOR Design, Engineering, Supply and Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of Solar Photovoltaic Grid-Connected Power Plants of 3000 MW capacities Anywhere in India]
[EOI/Solar/3000 MW dated 01.09.2025][2025_CILHQ_343032_1]
|
Coal India Limited||Coal India Limited,HQ,Kolkata||CIL-HQ_Solar (EED)
|
3. |
05-Sep-2025 06:00 PM |
16-Sep-2025 03:00 PM |
17-Sep-2025 11:00 AM |
[Renovation of 02 Nos. community places (Durga Mandap n Kali Mandir) at Pindra Colliery of Kuju Area.]
[GM(K)/SO(C)/e-NIT/2025-26/289][2025_CCL_343333_1]
|
Central Coalfields Limited||Kuju
|
4. |
02-Sep-2025 06:00 PM |
16-Sep-2025 04:00 PM |
17-Sep-2025 05:00 PM |
[Repairing and reconditioning of 03 Nos 60Amp, 3.3KV, 180KW HT Starter at Gidi-A Project under Argada Area ]
[PE(EnM)/GDA/eNT/25-26/07 Dated 02.09.2025][2025_CCL_343021_1]
|
Central Coalfields Limited||Argada
|
5. |
05-Sep-2025 06:30 PM |
16-Sep-2025 05:00 PM |
17-Sep-2025 11:00 AM |
[Repairing of gear teeths of APHMEL make gear boxes (TB1, TB3, TB4 and TB6) including welding/ filling of teeth material and its machining as per its original design under Churi Colliery, NK Area]
[GM (NK)/EnM/e-NIT/2025-26/86 ][2025_CCL_343335_1]
|
Central Coalfields Limited||NK Dakara
|
6. |
05-Sep-2025 05:00 PM |
16-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
[Dismantling and re loaction of 220V Overhead line at upper dumping in the mines under Sonepur Bazari Project.]
[GM/SBA/EnM/TENDER/25-26/40][2025_ECL_343280_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
7. |
05-Sep-2025 05:00 PM |
16-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
[Fitting replacement of Bearings of 525KW motor (SI no. 2221113/04) and bearing bush, bearing cap AND bearing body of Pump unit (Sl. No. 23026078 10 04) with Coupling bolt and bush of 2000 GPM pump-motor set, 200 m head of S. B. Project.]
[GM/SBA/EnM/TENDER/25-26/41][2025_ECL_343282_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
8. |
05-Sep-2025 05:20 PM |
16-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
[Repairing n maintenance of Isolator of 06 nos. of 6.6 KV, HT Starter (Make Sait Mine Pvt Ltd n Prabhu) attached with pump motor set running under Sonepur Bazai Project.]
[GM/SBA/EnM/TENDER/25-26/45][2025_ECL_343288_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
9. |
05-Sep-2025 05:05 PM |
16-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
[Cleaning and trimming in and around outdoor structure , PTs , CTS , isolator etc at 25MVA, 33KV/11-6.6KV substation under Sonepur Bazari Project.]
[GM/SBA/EnM/TENDER/25-26/43][2025_ECL_343286_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|
10. |
05-Sep-2025 05:05 PM |
16-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
[Complete repairing/rewinding of 410KW, 6.6KV Induction Motor Sl. No. 3F660894/3 Make-Marathon of Sonepur Bazari Project.]
[GM/SBA/EnM/TENDER/25-26/44][2025_ECL_343287_1]
|
Eastern Coalfields Limited||ECL_Sonepur Bazari area
|