The eProcurement System of Coal India Limited enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
|
|
| |
1. Repairing/reconditioning of 02 nos VCB (A) 3.3KV,400Amp, Mineline make VCB S.No.(B) 11KV ,400Amp,Meditron make VCB S.No.9472 at main substation of Karma project under Kuju Area. |
GM (K)/EnM/eTender/24-25/05 |
17-May-2024 06:55 PM |
18-May-2024 11:00 AM |
2. Complete wiring of newly constructed shed of 3 nos. Union Offices i.e. OCMS, HMS and BMS at BIT Colony, Lakhanpur Area, MCL |
MCL/LKPA/EnM/eNIT/24-25/11 dt-07.05.2024 |
20-May-2024 05:00 PM |
22-May-2024 11:00 AM |
3. Deployment of hydraulic excavator (3D) or equivalent machine for cleaning and cutting and miscellaneous earthwork in different places of mine premises excluding CT road during monsoon period -2024 at Kaniha OCP of Kaniha Area (Re Tender) |
MCL/GM(KA)/SO(C)/2024-25/97 DT. 07/05/24 |
20-May-2024 05:00 PM |
22-May-2024 11:00 AM |
4. Construction of Box Culvert near west Coal Yard Tri Junction and Construction of RCC retaining wall in Coal Section at Jayant project |
GM(C)/SGR/24-25/ETN-02 Dated 07.05.2024 |
24-May-2024 05:00 PM |
25-May-2024 05:00 PM |
5. Electrical Wiring of Non-residential buildings at Rest rooms, Store room, Latrine room of filter bed, INTUC Office rooms, Security guard rooms, Coal dispatch room, and Drinking water supply room at Project Office of JNC, JA. |
GM(JA)/EnM/e-Tender/ 24-25/E-648/13 Dtd 07/05/2024 |
20-May-2024 05:00 PM |
22-May-2024 11:00 AM |
6. Repairing/overhauling of 127HP ,06 Cylinder water cooled Kirloskar make diesel engine type 6R1080T attach with one no UP150-45 pump, 1500rpm,80 meter head of Kirloskar make S.No. 124800912 installed at Karma Project under Kuju Area. |
GM (K)/EnM/eTender/24-25/03 |
17-May-2024 06:55 PM |
18-May-2024 11:00 AM |
7. Repairing/reconditioning of 2000GPM Pump, 02 stage ,540CUM,150METER HEAD S.No. 17042951/20/02 make Flowmore of Karma project under Kuju Area. |
GM (K)/EnM/eTender/24-25/06 |
17-May-2024 06:55 PM |
18-May-2024 11:00 AM |
8. Pipe line |
SO(EnM)/Rjp/24-25/Et/17dt 07.05.24 |
17-May-2024 06:00 PM |
18-May-2024 06:30 PM |
9. Day to day mechanical work for strengthening of different structure Feeder Breaker of both CKT, CHP at LOCP, IBVA for a period of 02 years. |
MCL/GM/IBV/ENM/etender/112130 Dated.07.05.2024 |
18-May-2024 05:00 PM |
20-May-2024 11:00 AM |
10. Day to day electrical maintenance/repair work of electrical installation including 11KV/3.3KV/440V OH line ,cable Handling, light fittings from Lingaraj main Substation to Sharma Chhack colony and inside the Premises of Deulbera and Sharma Chhack col |
GM/LA/SO/EnM/e-Ten/24-25/09 DT-07.05.24 |
23-May-2024 05:00 PM |
24-May-2024 10:00 AM |
|
|
|
|
|
|
|
|
|
|
|