1. |
06-Sep-2025 06:00 PM |
18-Sep-2025 04:00 PM |
19-Sep-2025 04:00 PM |
[ Repairing of end cover dala (D.E) and repairing of rotor bar of three nos. induction motor 1) 180KW, Volts-550, S.I.No- WNP and 2) 140KW, Volts-550 S.I.No-WNP and 3) 180 KW, 440V, Si.No NADX91652 all running at intake riverside pump house under Kath]
[KTC/PE/EnM/25-26/36 Date-06.09.2025][2025_CCL_343368_1]
|
Central Coalfields Limited||Kathara
|
2. |
06-Sep-2025 04:00 PM |
18-Sep-2025 04:00 PM |
19-Sep-2025 04:00 PM |
[For repairing of 03 nos. moving lighting tower with fixingof different LED light sets at KOCP under Hazaribagh Area.]
[PO/KOCP/EnM/Tender/25 26/07][2025_CCL_343398_1]
|
Central Coalfields Limited||Hazaribag
|
3. |
06-Sep-2025 04:00 PM |
18-Sep-2025 04:00 PM |
19-Sep-2025 12:00 PM |
[Repairing of pot holes from weekly market to toward Lathi Village under Wani North Area]
[wn4650-civ-e085-2025-26 dt.06.09.2025][2025_WCL_343377_1]
|
Western Coalfields Limited||Wani N||Wani N_Civil
|
4. |
06-Sep-2025 06:00 PM |
18-Sep-2025 04:00 PM |
19-Sep-2025 04:00 PM |
[Complete repairing and rewinding of 01 no 630KVAS, 11KV/440V, Hindustan make Transformer with SI. No . A1674, installed at Rawani tola under kathara colliery, kathara Area.]
[KTC/PE/EnM/25-26/37 Date - 06.09.2025][2025_CCL_343376_1]
|
Central Coalfields Limited||Kathara
|
5. |
08-Sep-2025 05:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Partial Repairing Cork Sheet Change Stud Change of 3 Nos. Lighting Transformer (a)1000KVA,11KV/440V(b) 500KV,11KV/550V(C ) 100KVA,3.3KV/440V TMC(2)and Maintenance and Overhauling and Transformer Oil Filtration of 500KVA 11KV/440V Transformer ]
[GM/SA/AM(EnM)-NIT/2025-26/058][2025_BCCL_343478_1]
|
Bharat Coking Coal Limited||BCCL_SIJUA AREA
|
6. |
03-Sep-2025 05:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
[New Installation of 02 nos of 1000mm belt conveyor for LHCM in RIV bottom seam development panels of Khottadih Colliery under Pandaveswar Area]
[GM-PND/EandM/25-26/132/660 dated 01/09/2025][2025_ECL_343099_1]
|
Eastern Coalfields Limited||ECL_Pandaveswar area
|
7. |
06-Sep-2025 06:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
[Repairing of undercarriage and repairing of LHS Final Drive of BD155 Dozer Sl. No. 13591 of Religara Project.]
[SO(X)(A)/e-NIT/38/25-26/116][2025_CCL_343387_1]
|
Central Coalfields Limited||Argada
|
8. |
05-Sep-2025 05:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Repairing of ambulance bearing regd. no OR 19N 3585 (TATA winger) and Fire Tender bearing regd. No. OD-19B-8322 of of Balram OCP, HA.]
[MCL/GM/HA/EnM/ e-Tender/25-26/160 Dt. 05.09.25][2025_MCL_343301_1]
|
Mahanadi Coalfields Limited||HINGULA AREA||HING_E AND M||E AND M
|
9. |
05-Sep-2025 05:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Repairing and maintenance of weighbridge structure of 7 nos. of Static road weighbridges and 06 nos. of In-motion road weighbridges of Balram OCP on as and when required basis for a period of 365 days.]
[MCL/GM/HA/EnM/ e-Tender/25-26/161 Dt. 05.09.25][2025_MCL_343310_1]
|
Mahanadi Coalfields Limited||HINGULA AREA||HING_E AND M||E AND M
|
10. |
05-Sep-2025 06:55 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
[PROVIDING AND FIXING RCC CRASH BARRIER AROUND NEWLY FORMED WHEEL WASH SYSTEM AT KOCP UNDER KA RE TENDER]
[MCL/GM(KA)/SO(C)/25-26/331 DT. 05.09.2025][2025_MCL_343317_1]
|
Mahanadi Coalfields Limited||KANIHA AREA||KANIHA_CIVIL||CIVIL
|