1. |
29-Mar-2024 10:00 AM |
19-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Construction of Settling tank for mine water discharge, Shed for burnt oil, Wind barrier at SAM Office campus and Wind barrier at Coal Stockyard at Baroud Sub Area.]
[SECL/GM/RGH/SOC/e-Tender/ 2023-24/38 dtd 28.03.2024][2024_SECL_305954_1]
|
South Eastern Coalfields Limited||Raigarh Area
|
2. |
23-Mar-2024 05:00 PM |
19-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Establishment of Integrated Command and Control Centre (ICCC) and allied works at Annex Building, SECL, HQ, Bilaspur on Turnkey Basis including maintenance for 5 years during Defect Liability Period (DLP) (2nd Call)]
[GM(C)/SECL/BSP/e-T_TK/TA/2024/ 100 dtd. 21.03.2024][2024_SECL_305772_1]
|
South Eastern Coalfields Limited||SECL Hqtrs||HQ_Civil
|
3. |
04-Apr-2024 10:00 AM |
19-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Widening of road at laikera siding using old prestressed railway sleepers under Kulda OCP of Basundhara Area.]
[MCL/GM/BA/C/e-Tender/24-25/01 dt.03.04.2024][2024_MCL_306240_1]
|
Mahanadi Coalfields Limited||BASUNDHARA GARJANBAHAL AREA||BG _CIVIL||CIVIL
|
4. |
05-Apr-2024 11:00 AM |
19-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Construction of Parking Shed inside Colony Complex of CMPDI RIV Bilaspur CG FY 2024-25]
[CMPDI/RV/CVL/24-25/01/172 dated 04.04.2024][2024_CMPDI_306265_1]
|
Central Mine Planning and Design Institute Limited||Regional Institute - V||RR-V-Civil Department
|
5. |
03-Apr-2024 06:55 PM |
19-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Haulage Track Line Extension and Track Line Packing work (1960mtr) at 140NL Dist, 135NL Dist. and 135SL Dist of Sec l and assistance Required for maintenance of Existing Track Line (7928mtr.) for Orient Colliery Mine No 1 and 2, OSA, OA, MCL]
[MCL/GM/OA/SO(M)/2024/ NIT-226/228, Dated- 03.04.2024][2024_MCL_306248_1]
|
Mahanadi Coalfields Limited||ORIENT AREA||ORIEN_MINING||MINING
|
6. |
05-Apr-2024 10:00 AM |
19-Apr-2024 05:00 PM |
22-Apr-2024 11:00 AM |
[Regular Cleaning and Desilting of ground water tank, settling tank and pucca drain along railway track of Kanika Siding of Garjanbahal OCP under Basundahra Area.]
[MCL/GM/BA/C/e-Tender/24-25/03 dt.04.04.2024][2024_MCL_306260_1]
|
Mahanadi Coalfields Limited||BASUNDHARA GARJANBAHAL AREA||BG _CIVIL||CIVIL
|
7. |
10-Apr-2024 11:00 AM |
19-Apr-2024 05:00 PM |
20-Apr-2024 11:00 AM |
[LT Overhead line maintenance (1) From weighbridge 15 to coal stock 32 including sump no-34 (ii) From Junction point near Coal Stock 32 to Check post 11 via weighbridge 13 and 17 including weighbridge-18, checkpost-10]
[GM(MS)/SO(EnM)/e-NIT/24-25/04][2024_CCL_306432_1]
|
Central Coalfields Limited||Magadh and Amrapali
|
8. |
10-Apr-2024 11:00 AM |
19-Apr-2024 05:00 PM |
20-Apr-2024 11:00 AM |
[Provision of Garden/pathway lighting and area lighting at D-1 Sur Vihar Colony under M-S Area]
[GM(MS)/SO(EnM)/e-NIT/24-25/05][2024_CCL_306433_1]
|
Central Coalfields Limited||Magadh and Amrapali
|
9. |
28-Mar-2024 10:00 AM |
19-Apr-2024 05:00 PM |
20-Apr-2024 05:00 PM |
[Complete renovation of 52 units D type new 11 units CTS 36 units and C type 5 units under GM Unit Rajrappa Area]
[CCL/Rajrappa/GM Unit/Civil/NIT/23-24/64][2024_CCL_305924_1]
|
Central Coalfields Limited||Rajrappa
|
10. |
28-Mar-2024 05:00 PM |
19-Apr-2024 05:00 PM |
20-Apr-2024 05:00 PM |
[Supply, installation, testing and commissioning of 100 MT capacity Electronic Pitless Type Road ]
[ECL/HQ/EnM/WB1/59 dt.27.03.2024][2024_ECL_305952_1]
|
Eastern Coalfields Limited||ECL_Head quarter ||E and M Div-HQ
|