Logo
Notices
« Instruction to Bidders for Tender cum Auction « Removal of 2 of 2 bid Openers « Important Instruction for User Enrollment and mapping the Digital Signature Certificate (DSC) in eProcurement Portal.
 
 
 
  Tenders/Auctions Closing Today
 
 
 Search By     
 
 
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 12-Jun-2021 05:00 PM 23-Jun-2021 09:00 AM 24-Jun-2021 09:00 AM [Painting of poles and coiling with barbed wire for the safety of poles and lights at View Tower Area and fixing of transformer and lights at Patch-B pumphouse under Ashok OCP] [PO(AK)/PE(EnM)/e-NIT/21-22/03][2021_CCL_208866_1] Central Coalfields Limited||Piparwar
2. 12-Jun-2021 05:00 PM 23-Jun-2021 09:00 AM 24-Jun-2021 09:00 AM [Procurement of insulator of brush holder of Shovel P and H-1900AL through Local Purchase under Ashok OCP] [PO(AK)/PE(EnM)/e-NIT/21-22/05][2021_CCL_208881_1] Central Coalfields Limited||Piparwar
3. 12-Jun-2021 05:00 PM 23-Jun-2021 09:00 AM 24-Jun-2021 09:00 AM [Upgradation of 1 No. Starter panel of intake well for pump motor set of rating 260KW, 3.3 KV, 3 phase under Ashok OCP ] [PO(AK)/PE(EnM)/e-NIT/21-22/08 ][2021_CCL_208896_1] Central Coalfields Limited||Piparwar
4. 12-Jun-2021 05:00 PM 23-Jun-2021 09:00 AM 24-Jun-2021 09:00 AM [Repairing of 75 Nos Ceiling fans installed in various quarters at colonies under Piparwar patch of Ashok OCP] [PO(AK)/PE(EnM)/e-NIT/21-22/06][2021_CCL_208886_1] Central Coalfields Limited||Piparwar
5. 12-Jun-2021 05:00 PM 23-Jun-2021 09:00 AM 24-Jun-2021 09:00 AM [Preparation of 8 nos. Earth pit for making earthing grid for neutral and body earthing for transformer of various rating installed at Colonies under Piparwar Patch of Ashok OCP Piparwar Area.] [PO(AK)/PE(EnM)/e-NIT/21-22/07][2021_CCL_208889_1] Central Coalfields Limited||Piparwar
6. 12-Jun-2021 05:00 PM 23-Jun-2021 09:00 AM 24-Jun-2021 09:00 AM [Replacement of Faulty MCBs of B/13 to B/24 of Main Distribution Board and service cable from main DB to main switch of Quarter No. B/18, B/19, B/20, and B/21 at Basant Vihar Colony under Ashok OCP] [PO(AK)/PE(EnM)/e-NIT/21-22/04][2021_CCL_208867_1] Central Coalfields Limited||Piparwar
7. 15-Jun-2021 06:00 PM 23-Jun-2021 10:00 AM 24-Jun-2021 10:00 AM [Towards fixing of Asbestos tape in exhaust system of 03 nos. Dozers sl. no. 12928, 104849, 104854 at Tapin North OCP, Hazaribagh Area] [PE(X)/Tapin North OCP/NIT/ 21-22/14 Dt. 15/06/2021][2021_CCL_209093_1] Central Coalfields Limited||Hazaribag
8. 15-Jun-2021 06:00 PM 23-Jun-2021 10:00 AM 24-Jun-2021 10:00 AM [Repairing and rewinding of 02 nos. Oil cooled welding transformer 600 amp.,440 220 volt of Excavation workshop at Tapin North OCP, Hazaribagh Area] [PE(X)/Tapin North OCP/NIT/ 21-22/11 Dt. 15/06/202][2021_CCL_209084_1] Central Coalfields Limited||Hazaribag
9. 15-Jun-2021 06:00 PM 23-Jun-2021 10:00 AM 24-Jun-2021 10:00 AM [Repairing of Rear suspension both LH and RH for CAT 773E Dumpers sl. no. 1021 and 1022 at Tapin North OCP, Hazaribagh Area] [PE(X)/Tapin North OCP/NIT/ 21-22/13 Dt. 15/06/2021][2021_CCL_209091_1] Central Coalfields Limited||Hazaribag
10. 11-Jun-2021 06:00 PM 23-Jun-2021 10:00 AM 24-Jun-2021 11:00 AM [Fabrication/Erection of steel structural work vibrate feeder (01 No. and 04 No.) Feed chute, Tray, discharge chute in Main Washing Plant at Sawang Washery.] [SGW/KTA/ENM/E-Tender/21-22/20][2021_CCL_208764_1] Central Coalfields Limited||Kathara
Contents owned and maintained by Coal India Limited and its subsidiaries of Coal India Limited