S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 19-Mar-2024 10:00 AM 29-Mar-2024 05:00 PM 30-Mar-2024 11:00 AM [Providing and replacement of damaged Main switch, Busbar, Service connection wire of Multistoried C Type Block, B Type Block and MQ type Block at Rohini and Birsa Nagar Colony under Rohini Project, NK Area] [GM (NK)/EnM/e-NIT/2023-24/ 303][2024_CCL_305516_1] Central Coalfields Limited||NK Dakara
2. 13-Feb-2024 10:00 AM 29-Mar-2024 05:00 PM 01-Apr-2024 11:00 AM [Processing of OB to Generate Minimum 1000 cum of Sand per day, including Storage of Sand into the stock yard, Disposal of silt/clay/rejects to the designated site and Loading of Sand to the prospective consumer vehicle from stockyard] [GM(C)/SECL/BSP/e-T /KRB/2024/90 DATED 12.02.2024][2024_SECL_301028_1] South Eastern Coalfields Limited||SECL Hqtrs||HQ_Civil
3. 13-Mar-2024 11:00 AM 29-Mar-2024 05:00 PM 01-Apr-2024 11:00 AM [Dust Suppression by Truck Mounted Tankers (Minimum 9/12/15/18 KL capacity) on Road from Control tower, Suraksha Chowk, Silo road, workshop road, Shramik Chowk to Thana Chowk of Gevra Project of Gevra Area] [SECL/GA/ GM(C)/ETN/23-24/170 dtd. 11.03.2024][2024_SECL_304830_1] South Eastern Coalfields Limited||Gevra Area
4. 15-Mar-2024 11:00 AM 29-Mar-2024 05:00 PM 30-Mar-2024 11:00 AM [Maintenance of 33 KV Feeder No. 06 (from Piparwar CSS to KDH Old SS), Feeder No. 05 (from Piparwar CSS to KDH New SS) 33 KV Tie line in between both SSs of KDH OCP and tapping of 33 KV Lines from Feeder No. 05 and 06 to Churi UG Project of NK Area] [GM (NK)/EnM/e-NIT/2023-24/ 293][2024_CCL_305086_1] Central Coalfields Limited||NK Dakara
5. 15-Mar-2024 11:00 AM 29-Mar-2024 05:00 PM 30-Mar-2024 11:00 AM [Rearrangement of power supply of GM Office with inclusion of safety provision in wiring circuit under GM Unit, NK Area] [GM (NK)/EnM/e-NIT/2023-24/ 296][2024_CCL_305115_1] Central Coalfields Limited||NK Dakara
6. 15-Mar-2024 05:00 PM 29-Mar-2024 05:00 PM 30-Mar-2024 05:00 PM [Providing and fixing of breather container with silica gel for replacement of old and damaged silica gel for enhancement of breather capacity of power transformer installed at old and new sub-station under KDH OCP, NK Area.] [PO(KDH)/PE(EnM)/NIT/2023-24/59][2024_CCL_305196_1] Central Coalfields Limited||NK Dakara
7. 16-Mar-2024 02:00 PM 29-Mar-2024 05:00 PM 30-Mar-2024 11:00 AM [Diversion of 11kV OHL from backside of Rohini SS to Q.No. 02 SS and from Bank of Damodar River near Jamdih Village (four pole structure of existing 11KV Q.No. 01 Feeder) to opposite Bank of Damodar River side of Rohini SS under Purnadih OCP, NK Area] [GM (NK)/EnM/e-NIT/2023-24/ 298][2024_CCL_305339_1] Central Coalfields Limited||NK Dakara
8. 13-Mar-2024 10:00 AM 29-Mar-2024 05:00 PM 01-Apr-2024 11:00 AM [Pre-monsoon maintenance of HT / LT / lighting overhead line of various rehab villages under Dipka Area (Route length - about 10 KM).] [SECL/GM/DA/SO(EnM)/ e-tender/23-24/67 dtd-12/03/24][2024_SECL_304818_1] South Eastern Coalfields Limited||Dipika Area
9. 13-Mar-2024 10:00 AM 29-Mar-2024 05:00 PM 01-Apr-2024 11:00 AM [Maintenance of 33 KV outdoor bus-bar systems of 33 KV Main and Old Substations of Dipka Expansion Project.] [SECL/GM/DA/SO(EnM)/ e-tender/23-24/68 dtd-12/03/24][2024_SECL_304840_1] South Eastern Coalfields Limited||Dipika Area
10. 14-Mar-2024 06:55 PM 29-Mar-2024 05:00 PM 30-Mar-2024 11:00 AM [Proposed work of fixing of 25mm dia G.I. pipe for load cell cable proper covering in 15 Nos. weighbridge platform structure installed at Amrapali OCP under A-C Area] [ GM(A-C)/SO(EnM)/e-NIT/23-24/68][2024_CCL_304886_1] Central Coalfields Limited||Magadh and Amrapali