1. |
13-Mar-2024 06:00 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Repairing of Old/Worn-out Rollers and Fabrication of Cages pertaining to Live Ring Assembly of 24/96 Draglines at NCL Jayant Project.]
[JNT/GM(Excv)/E-tender/23-24/80][2024_NCL_304897_1]
|
Northern Coalfields Limited||Jayant Project
|
2. |
18-Mar-2024 06:00 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Installation of CCTV cameras at important places of Kathara Washery]
[PO/KTW/EnM(PR)/eTen/23-24/205][2024_CCL_305522_1]
|
Central Coalfields Limited||Kathara
|
3. |
18-Mar-2024 06:55 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Repairing / fabrication of 04 nos. 30 KW, 05 nos. 22 KW, 03 nos. 7.5 KW blower motors of 20/90 Dragline of Khadia Project. ]
[KHD/G.M. (Excv)/E-Tender/23-24/1245][2024_NCL_305545_1]
|
Northern Coalfields Limited||Khadia project
|
4. |
18-Mar-2024 06:00 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Repairing of bucket cylinders Part No. 30546733V assly and arm cylinder Assly Part No. 30546798R for LandT CK 300 Hyd. Shovel Sl.No EXC-2663 working at Jhingurda Project On Float.]
[JRD/SO(X)/E-TENDER/23-24/612 dated 18.03.2024][2024_NCL_305500_1]
|
Northern Coalfields Limited||Jhingurda Project
|
5. |
13-Mar-2024 11:00 AM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Thorough repairing and upgradation of NHS DS Type quarters Block No 01/1-16 (14 units), 04/49-64 (14 units), 06/81-96 (13 units), 18/199-206 (07 units), total 48 authorised units inside and outside at South Parasea under Parasea Gr of Mines, KNT Area]
[ECL/GM/KNT/CIVIL/E-TENDER/ 23-24/387][2024_ECL_304687_1]
|
Eastern Coalfields Limited||ECL_Kunostoria area
|
6. |
11-Mar-2024 05:00 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Repair of existing building at DAV public school, Kalyanpur under CSR scheme of Piparwar Area.]
[GM(PPR)/Civil/23-24 /5640 ][2024_CCL_304661_1]
|
Central Coalfields Limited||Piparwar
|
7. |
18-Mar-2024 06:55 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Supply and commissioning of New Coal transportation road lighting from old check post to new checkpost beside nallah at AADOCM Project, Dhori Area]
[GM(D)/SO(EnM)/DA/2023-24/166][2024_CCL_305504_1]
|
Central Coalfields Limited||Dhori
|
8. |
18-Mar-2024 06:00 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 12:00 PM |
[Making of the balanced portion of fan drift at 1 and 2 incline (shaft-E) and 3 and 4 incline (shaft-C) under JPC]
[GM/JNR/CIVIL/e-Tender/23-24/ 840 Date- 15-03-2024 ][2024_ECL_305526_1]
|
Eastern Coalfields Limited||ECL_Jhanjra area
|
9. |
18-Mar-2024 06:00 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Repairing. Overhauling and different type of hoses changing of CAT-988H, Sl. No. A7A00269 Pay Loader at Kathara Washery]
[PO/KTW/EnM(PR)/eTen/23-24/204][2024_CCL_305486_1]
|
Central Coalfields Limited||Kathara
|
10. |
18-Mar-2024 06:00 PM |
29-Mar-2024 11:00 AM |
30-Mar-2024 11:00 AM |
[Repairing/rebuilding of dipper door assembly (02Nos) of PandH-1900AL shovel at Kakri Project.]
[KKR/SO(Excv)/E-45/23-24/612][2024_NCL_305437_1]
|
Northern Coalfields Limited||Kakri Project
|